When to Plant Che Fruit in Robertson County, KY
This month in Robertson County, Kentucky
If you only do a handful of things in the garden this May, make it these. They're sequenced around your zone's frost timing.
-
Harden off and plant che fruit
Pinch off the lowest leaves on each seedling before you plant — it reduces water loss while the roots catch up.
Che fruit (Chinese mulberry) is a small, cold-hardy tree producing round, red fruits with a sweet, watermelon-fig flavor. It is an underutilized fruit tree with great potential.
Robertson County, Kentucky is in USDA Zone 6b. The average last spring frost is April 16 and the first fall frost is October 26, giving you a growing season of approximately 193 days.
At an elevation of 2,352 feet, Robertson County receives approximately 43 inches of rainfall annually with predominantly silt loam soil. Summer highs average 85°F, providing good warmth for Che Fruit during the growing season.
Robertson County Soil Profile
Soil Type
Silt Loam
Soil pH
5.7-6.5
Drainage
Well Drained
Plant Planting Risk Windows
Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.
Soil Compatibility in Robertson County
How your county's soil matches Che Fruit's growing requirements.
Soil pH
Your soil pH (5.7–6.5) overlaps with Che Fruit's range (6.0–7.5), though not a perfect match.
Soil Texture
The silt loam soil in Robertson County is excellent for Che Fruit — good drainage, moisture retention, and nutrient holding capacity.
Organic Matter
Organic matter is moderate (2.5%). Annual compost additions will help Che Fruit.
How to Plant Che Fruit
Plant Water Budget
Water stress score is 6/10 — consider drought-tolerant varieties and mulching
Monthly Watering Guide for Che Fruit
Che Fruit needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.
| Month | Che Fruit Needs | Rainfall | You Supplement | Action |
|---|---|---|---|---|
| Jan | — | 3.9" | 0" | ❄️ Dormant |
| Feb | — | 3.3" | 0" | ❄️ Dormant |
| Mar | — | 4.2" | 0" | ❄️ Dormant |
| Apr | 4.3" | 2.8" | 1.5" | 💧 Light watering |
| May | 4.3" | 3.3" | 1" | 💧 Light watering |
| Jun | 4.3" | 4.3" | 0" | ✅ Rainfall sufficient |
| Jul | 4.3" | 4.8" | 0" | ✅ Rainfall sufficient |
| Aug | 4.3" | 4.4" | 0" | ✅ Rainfall sufficient |
| Sep | 4.3" | 3.2" | 1.1" | 💧 Light watering |
| Oct | 4.3" | 2.7" | 1.6" | 💧 Light watering |
| Nov | — | 3.1" | 0" | ❄️ Dormant |
| Dec | — | 3" | 0" | ❄️ Dormant |
Water needs are for active growing months only (Apr–Oct in Robertson County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.
Che Fruit Heat Requirements (GDD)
What are Growing Degree Days (GDD)?
Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" — every day above 50°F deposits warmth that helps your plants grow.
Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.
Che Fruit Planting Timeline — Robertson County, KY
Che Fruit Planting Calendar
| Activity | When | Date Range |
|---|---|---|
| Transplant Outdoors | May 7 | May 7 – May 21 |
· 120" apart · Rows 144" apart
Month-by-Month Timeline
| Month | Activities |
|---|---|
| January | — |
| February | — |
| March | — |
| April | — |
| May | Transplant Outdoors |
| June | — |
| July | — |
| August | — |
| September | — |
| October | — |
| November | — |
| December | — |
Growing Conditions
☀️ Sun
Full Sun (6-8+ hours)
💧 Water
1"/week · Only during dry spells
📅 Days to Maturity
1095–1825 days
🧪 Soil pH
Needs 6–7.5 · Your soil: acceptable
🗺️ USDA Zone
Zone 6b
📆 Growing Season
193 days in Robertson County
Growing Tips for Che Fruit in Robertson County
Direct sow Che Fruit outdoors after April 16 in Robertson County when soil has warmed and frost danger has passed.
Your 193.0-day growing season in Robertson County is tight for Che Fruit (1095.0-1825.0 days to maturity). Start indoors and choose early-maturing varieties.
General growing tips
Plant in well-drained soil. A male pollinator is needed for seeded fruit, but seedless fruit can set parthenocarpically. Minimal pruning required. Fruits ripen in late summer.
Companion Planting
Good Companions
Check more plant combinations with our Companion Planting Checker →
Che Fruit in Other Locations
Frequently Asked Questions
When should I plant Che Fruit in Robertson County, KY?
Robertson County is in Zone 6b with an average last frost of April 16. Plan your Che Fruit planting based on this frost date — see the calendar above for exact timing.
What planting zone is Robertson County, KY?
Robertson County, Kentucky is in USDA Hardiness Zone 6b. The average last spring frost is April 16 and first fall frost is October 26.
Your Robertson County Garden Planner — Free
A 24-page printable planner built for Robertson County (Zone 6b). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.