When to Plant Che Fruit in Henderson County, KY
What to do in May
Welcome to May in Zone 7a. These are the moves that will have the biggest impact on your growing season.
Che fruit (Chinese mulberry) is a small, cold-hardy tree producing round, red fruits with a sweet, watermelon-fig flavor. It is an underutilized fruit tree with great potential.
Henderson County, Kentucky is in USDA Zone 7a. The average last spring frost is April 5 and the first fall frost is October 31, giving you a growing season of approximately 209 days.
At an elevation of 3,992 feet, Henderson County receives approximately 47.6 inches of rainfall annually with predominantly silt loam soil. Summer highs average 89°F, providing good warmth for Che Fruit during the growing season.
Henderson County Soil Profile
Soil Type
Silt Loam
Soil pH
5.3-7.1
Drainage
Well Drained
Plant Planting Risk Windows
Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.
Soil Compatibility in Henderson County
How your county's soil matches Che Fruit's growing requirements.
Soil pH
Your soil pH (5.3–7.1) overlaps with Che Fruit's range (6.0–7.5), though not a perfect match.
Soil Texture
The silt loam soil in Henderson County is excellent for Che Fruit — good drainage, moisture retention, and nutrient holding capacity.
Drainage
Drainage is adequate for Che Fruit.
Organic Matter
Organic matter is moderate (2.6%). Annual compost additions will help Che Fruit.
How to Plant Che Fruit
Plant Water Budget
Water stress score is 6/10 — consider drought-tolerant varieties and mulching
Monthly Watering Guide for Che Fruit
Che Fruit needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.
| Month | Che Fruit Needs | Rainfall | You Supplement | Action |
|---|---|---|---|---|
| Jan | — | 3.6" | 0" | ❄️ Dormant |
| Feb | — | 3.3" | 0" | ❄️ Dormant |
| Mar | — | 4.9" | 0" | ❄️ Dormant |
| Apr | 4.3" | 4" | 0.3" | 💧 Light watering |
| May | 4.3" | 4.2" | 0.1" | 💧 Light watering |
| Jun | 4.3" | 4.5" | 0" | ✅ Rainfall sufficient |
| Jul | 4.3" | 4.5" | 0" | ✅ Rainfall sufficient |
| Aug | 4.3" | 4.9" | 0" | ✅ Rainfall sufficient |
| Sep | 4.3" | 3.3" | 1" | 💧 Light watering |
| Oct | 4.3" | 2.8" | 1.5" | 💧 Light watering |
| Nov | — | 3.5" | 0" | ❄️ Dormant |
| Dec | — | 3.9" | 0" | ❄️ Dormant |
Water needs are for active growing months only (Apr–Oct in Henderson County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.
Che Fruit Heat Requirements (GDD)
What are Growing Degree Days (GDD)?
Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" — every day above 50°F deposits warmth that helps your plants grow.
Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.
Che Fruit Planting Timeline — Henderson County, KY
Che Fruit Planting Calendar
| Activity | When | Date Range |
|---|---|---|
| Transplant Outdoors | April 26 | Apr 26 – May 10 |
· 120" apart · Rows 144" apart
Month-by-Month Timeline
| Month | Activities |
|---|---|
| January | — |
| February | — |
| March | — |
| April | Transplant Outdoors |
| May | Transplant Outdoors |
| June | — |
| July | — |
| August | — |
| September | — |
| October | — |
| November | — |
| December | — |
Growing Conditions
☀️ Sun
Full Sun (6-8+ hours)
💧 Water
1"/week · Natural rainfall sufficient
📅 Days to Maturity
1095–1825 days
🧪 Soil pH
Needs 6–7.5 · Your soil: acceptable
🗺️ USDA Zone
Zone 7a
📆 Growing Season
209 days in Henderson County
Growing Tips for Che Fruit in Henderson County
Direct sow Che Fruit outdoors after April 05 in Henderson County when soil has warmed and frost danger has passed.
Your 209.0-day growing season in Henderson County is tight for Che Fruit (1095.0-1825.0 days to maturity). Start indoors and choose early-maturing varieties.
General growing tips
Plant in well-drained soil. A male pollinator is needed for seeded fruit, but seedless fruit can set parthenocarpically. Minimal pruning required. Fruits ripen in late summer.
Companion Planting
Good Companions
Check more plant combinations with our Companion Planting Checker →
Che Fruit in Other Locations
Frequently Asked Questions
When should I plant Che Fruit in Henderson County, KY?
Henderson County is in Zone 7a with an average last frost of April 5. Plan your Che Fruit planting based on this frost date — see the calendar above for exact timing.
What planting zone is Henderson County, KY?
Henderson County, Kentucky is in USDA Hardiness Zone 7a. The average last spring frost is April 5 and first fall frost is October 31.
Your Henderson County Garden Planner — Free
A 24-page printable planner built for Henderson County (Zone 7a). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.