Blog

When to Plant Che Fruit in Ohio County, IN

Ohio County, Indiana Zone 6b May

May in the garden — Ohio County, Indiana

If you only do a handful of things in the garden this May, make it these. They're sequenced around your zone's frost timing.

Avg. last frost April 17
Avg. first frost October 19
Soil temp (4") 62°F
Watering Moderate
Pest pressure Low
Daylight 14.1 hrs
  1. Harden off and plant che fruit

    Plant tomatoes deep — bury the stem up to the first true leaves to grow extra roots. Everything else goes in at the same depth it grew in the tray.

Instant PDF download. No spam, unsubscribe any time.

Che fruit (Chinese mulberry) is a small, cold-hardy tree producing round, red fruits with a sweet, watermelon-fig flavor. It is an underutilized fruit tree with great potential.

Ohio County, Indiana is in USDA Zone 6b. The average last spring frost is April 17 and the first fall frost is October 19, giving you a growing season of approximately 185 days.

At an elevation of 882 feet, Ohio County receives approximately 33.5 inches of rainfall annually with predominantly silt loam soil. Summer highs average 89°F, providing good warmth for Che Fruit during the growing season.

Ohio County, IN (Zone 6b) Moderate season
185 days
Last Spring Frost April 17
185 growing days
First Fall Frost October 19
Share this guide:

Ohio County Soil Profile

Soil Type

Silt Loam

Soil pH

5.7-7.1

Drainage

Well Drained

Plant Planting Risk Windows

Early Start (70% safe) ✓ Fits season
Transplant: May 1
Recommended (50%) ✓ Fits season
Transplant: May 8
Safe Start (90%) ✓ Fits season
Transplant: May 28

Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.

Soil Compatibility in Ohio County

How your county's soil matches Che Fruit's growing requirements.

Soil pH

Your soil pH (5.7–7.1) overlaps with Che Fruit's range (6.0–7.5), though not a perfect match.

Soil Texture

The silt loam soil in Ohio County is excellent for Che Fruit — good drainage, moisture retention, and nutrient holding capacity.

Drainage

Drainage is adequate for Che Fruit.

Organic Matter

Organic matter is excellent (4.6%) — Che Fruit will thrive.

How to Plant Che Fruit

120"
Between Plants
144"
Between Rows

Plant Water Budget

Plant needs
1.0″/week
Rainfall provides
0.8″/week
You supply
0.5″/week
Watering frequency 1-2 times/week
Season total 888 gal / 100 sq ft

Monthly Watering Guide for Che Fruit

Che Fruit needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.

Month Che Fruit Needs Rainfall You Supplement Action
Jan 1.2" 0" ❄️ Dormant
Feb 1.6" 0" ❄️ Dormant
Mar 2.3" 0" ❄️ Dormant
Apr 4.3" 2.9" 1.4" 💧 Light watering
May 4.3" 3.7" 0.6" 💧 Light watering
Jun 4.3" 4.9" 0" ✅ Rainfall sufficient
Jul 4.3" 3.9" 0.4" 💧 Light watering
Aug 4.3" 3.5" 0.8" 💧 Light watering
Sep 4.3" 2.6" 1.7" 💧 Light watering
Oct 4.3" 2.5" 1.8" 💧 Light watering
Nov 2.6" 0" ❄️ Dormant
Dec 1.9" 0" ❄️ Dormant

Water needs are for active growing months only (Apr–Oct in Ohio County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.

Che Fruit Heat Requirements (GDD)

What are Growing Degree Days (GDD)?

Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" — every day above 50°F deposits warmth that helps your plants grow.

Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.

Che Fruit needs ~24,455 GDD — county provides 3,098 GDD May not mature

Che Fruit Planting Timeline — Ohio County, IN

Che Fruit Planting Calendar

Activity When Date Range
Transplant Outdoors May 8 May 8 – May 22

· 120" apart · Rows 144" apart

Month-by-Month Timeline

MonthActivities
January
February
March
April
May Transplant Outdoors
June
July
August
September
October
November
December
Share this guide:

Growing Conditions

☀️ Sun

Full Sun (6-8+ hours)

💧 Water

1"/week · 1-2 times/week

📅 Days to Maturity

1095–1825 days

🧪 Soil pH

Needs 6–7.5 · Your soil: acceptable

🗺️ USDA Zone

Zone 6b

📆 Growing Season

185 days in Ohio County

Growing Tips for Che Fruit in Ohio County

Direct sow Che Fruit outdoors after April 17 in Ohio County when soil has warmed and frost danger has passed.

Your 185.0-day growing season in Ohio County is tight for Che Fruit (1095.0-1825.0 days to maturity). Start indoors and choose early-maturing varieties.

General growing tips

Plant in well-drained soil. A male pollinator is needed for seeded fruit, but seedless fruit can set parthenocarpically. Minimal pruning required. Fruits ripen in late summer.

Companion Planting

Good Companions

Check more plant combinations with our Companion Planting Checker →

Frequently Asked Questions

When should I plant Che Fruit in Ohio County, IN?

Ohio County is in Zone 6b with an average last frost of April 17. Plan your Che Fruit planting based on this frost date — see the calendar above for exact timing.

What planting zone is Ohio County, IN?

Ohio County, Indiana is in USDA Hardiness Zone 6b. The average last spring frost is April 17 and first fall frost is October 19.

🌱

Your Ohio County Garden Planner — Free

A 24-page printable planner built for Ohio County (Zone 6b). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.

Instant PDF download. No spam, unsubscribe any time.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Ohio County, IN. Local conditions may vary. Last updated: May 2026.

Sources & credits

Every number on this page traces back to a primary horticulture or government data source. Click through to verify.