When to Plant Feverfew in Clear Creek County, CO
Your May gardening checklist
May is a pivotal month for Clear Creek County, Colorado gardens. Focus on these tasks first and you'll set up the rest of the season for success.
-
Transplant feverfew outside
Bring a watering can to the bed. Each transplant gets a drink the moment it's in the ground, not ten minutes later.
Feverfew is a bushy perennial herb with small daisy-like flowers and aromatic leaves. It has been used traditionally for headache relief and is a cheerful garden plant.
Clear Creek County, Colorado is in USDA Zone 5a. The average last spring frost is May 14 and the first fall frost is September 26, giving you a growing season of approximately 135 days.
At an elevation of 6,538 feet, Clear Creek County receives approximately 24.6 inches of rainfall annually with predominantly loam soil. Summer highs average 83°F, so choose short-season varieties of Feverfew to ensure they mature before fall.
Clear Creek County Soil Profile
Soil Type
Loam
Soil pH
6.8-8.1
Drainage
Well Drained
Plant Planting Risk Windows
Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.
Soil Compatibility in Clear Creek County
How your county's soil matches Feverfew's growing requirements.
Soil pH
Your soil pH (6.8–8.1) is more alkaline than Feverfew prefers (6.0–7.0). Add sulfur or peat moss to lower pH.
Soil Texture
The loam soil in Clear Creek County is excellent for Feverfew — good drainage, moisture retention, and nutrient holding capacity.
Organic Matter
Organic matter is moderate (2.2%). Annual compost additions will help Feverfew.
How to Plant Feverfew
Plant Water Budget
Water stress score is 8/10 — consider drought-tolerant varieties and mulching
Monthly Watering Guide for Feverfew
Feverfew needs approximately 0.5 inches of water per week (2.2" per month). Here's how your county's rainfall compares month by month.
| Month | Feverfew Needs | Rainfall | You Supplement | Action |
|---|---|---|---|---|
| Jan | — | 1.9" | 0" | ❄️ Dormant |
| Feb | — | 1.5" | 0" | ❄️ Dormant |
| Mar | — | 1.9" | 0" | ❄️ Dormant |
| Apr | — | 2.7" | 0" | ❄️ Dormant |
| May | 2.2" | 2.7" | 0" | ✅ Rainfall sufficient |
| Jun | 2.2" | 1.7" | 0.5" | 💧 Light watering |
| Jul | 2.2" | 2.4" | 0" | ✅ Rainfall sufficient |
| Aug | 2.2" | 2.4" | 0" | ✅ Rainfall sufficient |
| Sep | 2.2" | 2.1" | 0.1" | 💧 Light watering |
| Oct | — | 2.3" | 0" | ❄️ Dormant |
| Nov | — | 1.9" | 0" | ❄️ Dormant |
| Dec | — | 1.2" | 0" | ❄️ Dormant |
Water needs are for active growing months only (May–Sep in Clear Creek County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.
Feverfew Heat Requirements (GDD)
What are Growing Degree Days (GDD)?
Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" — every day above 50°F deposits warmth that helps your plants grow.
Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.
Feverfew Planting Timeline — Clear Creek County, CO
Feverfew Planting Calendar
| Activity | When | Date Range |
|---|---|---|
| Transplant Outdoors | May 21 | May 21 – Jun 4 |
| Harvest | August 20 | Aug 20 – Nov 5 |
Plant 0.5" deep · 8" apart · Rows 12" apart
Month-by-Month Timeline
| Month | Activities |
|---|---|
| January | — |
| February | — |
| March | — |
| April | — |
| May | Transplant Outdoors |
| June | Transplant Outdoors |
| July | — |
| August | Harvest |
| September | Harvest |
| October | Harvest |
| November | Harvest |
| December | — |
Growing Conditions
☀️ Sun
Full Sun (6-8+ hours)
💧 Water
0.5"/week · Natural rainfall sufficient
📅 Days to Maturity
90–120 days
🧪 Soil pH
Needs 6–7 · Your soil: too_alkaline
🗺️ USDA Zone
Zone 5a
📆 Growing Season
135 days in Clear Creek County
Growing Tips for Feverfew in Clear Creek County
Direct sow Feverfew outdoors after May 14 in Clear Creek County when soil has warmed and frost danger has passed.
Common pests for Feverfew in this region include aphids and slugs. Use row covers early in the season and inspect plants weekly.
Clear Creek County receives only 25" of rain annually. Feverfew needs consistent moisture — install drip irrigation or water deeply 2-3 times per week.
General growing tips
Start seeds indoors or direct sow on the soil surface. Deadhead regularly to prevent aggressive self-seeding. Divide clumps every 2-3 years to maintain vigor.
Companion Planting
Good Companions
Check more plant combinations with our Companion Planting Checker →
Feverfew in Other Locations
Frequently Asked Questions
When should I plant Feverfew in Clear Creek County, CO?
Clear Creek County is in Zone 5a with an average last frost of May 14. Plan your Feverfew planting based on this frost date — see the calendar above for exact timing.
What planting zone is Clear Creek County, CO?
Clear Creek County, Colorado is in USDA Hardiness Zone 5a. The average last spring frost is May 14 and first fall frost is September 26.
Your Clear Creek County Garden Planner — Free
A 24-page printable planner built for Clear Creek County (Zone 5a). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.