When to Plant Komatsuna in Perry County, AR
Your May planting checklist for Perry County, Arkansas
A quick May briefing for Perry County, Arkansas gardeners — what's urgent, what's next, and what can wait.
-
It's harvest week for komatsuna
Check every 1–2 days. Many of these get tough or go to seed if you wait too long.
June prep starts now
- First harvests: komatsuna
Komatsuna (Japanese mustard spinach) is a versatile Asian green with glossy, dark leaves and a mild, sweet flavor. It is extremely cold-hardy and heat-tolerant.
Perry County, Arkansas is in USDA Zone 8a. The average last spring frost is March 26 and the first fall frost is November 9, giving you a growing season of approximately 228 days.
At an elevation of 663 feet, Perry County receives approximately 51.3 inches of rainfall annually with predominantly silt loam soil. Summer highs average 92°F, providing good warmth for Komatsuna during the growing season. Ample rainfall means less supplemental watering, but ensure good drainage to prevent Komatsuna root diseases.
Perry County Soil Profile
Soil Type
Silt Loam
Soil pH
5.6-6.7
Drainage
Well Drained
Plant Planting Risk Windows
Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.
Soil Compatibility in Perry County
How your county's soil matches Komatsuna's growing requirements.
Soil pH
Your soil pH (5.6–6.7) overlaps with Komatsuna's range (6.0–7.5), though not a perfect match.
Soil Texture
The silt loam soil in Perry County is excellent for Komatsuna — good drainage, moisture retention, and nutrient holding capacity.
Drainage
Drainage is adequate for Komatsuna.
Organic Matter
Organic matter is moderate (2.6%). Annual compost additions will help Komatsuna.
How to Plant Komatsuna
Fall planting: Sow 10 weeks before your first frost date for a fall harvest.
Succession Planting Komatsuna
Sow every 4 weeks. Last sowing by Sep 20 to harvest before frost.
For a dedicated fall crop, sow by Aug 31.
Plant Water Budget
Monthly Watering Guide for Komatsuna
Komatsuna needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.
| Month | Komatsuna Needs | Rainfall | You Supplement | Action |
|---|---|---|---|---|
| Jan | — | 4.4" | 0" | ❄️ Dormant |
| Feb | — | 4.5" | 0" | ❄️ Dormant |
| Mar | 4.3" | 4.8" | 0" | ✅ Rainfall sufficient |
| Apr | 4.3" | 4.2" | 0.1" | 💧 Light watering |
| May | 4.3" | 3.6" | 0.7" | 💧 Light watering |
| Jun | 4.3" | 4.8" | 0" | ✅ Rainfall sufficient |
| Jul | 4.3" | 4.7" | 0" | ✅ Rainfall sufficient |
| Aug | 4.3" | 5.4" | 0" | ✅ Rainfall sufficient |
| Sep | 4.3" | 4.1" | 0.2" | 💧 Light watering |
| Oct | 4.3" | 3.6" | 0.7" | 💧 Light watering |
| Nov | 4.3" | 3.3" | 1" | 💧 Light watering |
| Dec | — | 3.8" | 0" | ❄️ Dormant |
Water needs are for active growing months only (Mar–Nov in Perry County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.
Komatsuna Heat Requirements (GDD)
What are Growing Degree Days (GDD)?
Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" — every day above 50°F deposits warmth that helps your plants grow.
Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.
Komatsuna Planting Timeline — Perry County, AR
Komatsuna Planting Calendar
| Activity | When | Date Range |
|---|---|---|
| Start Indoors | February 19 | Feb 19 – Mar 5 |
| Transplant Outdoors | March 26 | Mar 26 – Apr 9 |
| Direct Sow | March 12 | Mar 12 – Apr 2 |
| Harvest | April 30 | Apr 30 – Jun 4 |
| Fall Sowing | August 31 | Aug 31 – Sep 14 |
Plant 0.5" deep · 6" apart · Rows 12" apart
Month-by-Month Timeline
| Month | Activities |
|---|---|
| January | — |
| February | Start Indoors |
| March | Start Indoors Transplant Outdoors Direct Sow |
| April | Transplant Outdoors Direct Sow Harvest |
| May | Harvest |
| June | Harvest |
| July | — |
| August | Fall Sowing |
| September | Fall Sowing |
| October | — |
| November | — |
| December | — |
Growing Conditions
☀️ Sun
Partial Shade (3-6 hours)
💧 Water
1"/week · Natural rainfall sufficient
📅 Days to Maturity
35–50 days
🧪 Soil pH
Needs 6–7.5 · Your soil: acceptable
🗺️ USDA Zone
Zone 8a
📆 Growing Season
228 days in Perry County
Growing Tips for Komatsuna in Perry County
Direct sow Komatsuna outdoors after March 26 in Perry County when soil has warmed and frost danger has passed.
Your generous 228.0-day season in Perry County allows multiple plantings of Komatsuna. Sow every 17.0 days for continuous harvest.
Common pests for Komatsuna in this region include cabbage worm and flea beetles. Use row covers early in the season and inspect plants weekly.
General growing tips
Direct sow in spring or fall. One of the most forgiving Asian greens for all seasons. Harvest outer leaves or cut whole plants. Excellent for stir-fries, soups, or salads.
Companion Planting
Good Companions
Avoid Planting Near
Check more plant combinations with our Companion Planting Checker →
Komatsuna in Other Locations
Frequently Asked Questions
When should I plant Komatsuna in Perry County, AR?
Perry County is in Zone 8a with an average last frost of March 26. Plan your Komatsuna planting based on this frost date — see the calendar above for exact timing.
What planting zone is Perry County, AR?
Perry County, Arkansas is in USDA Hardiness Zone 8a. The average last spring frost is March 26 and first fall frost is November 9.
Your Perry County Garden Planner — Free
A 24-page printable planner built for Perry County (Zone 8a). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.