When to Plant Mitsuba in Lonoke County, AR
Your May planting checklist for Lonoke County, Arkansas
We've pulled the most time-sensitive tasks for Lonoke County, Arkansas this May and put them front and centre. Tackle them in order.
-
Collect mitsuba at their peak
Taste as you pick. The first ripe produce is the best feedback loop you'll get all season.
A few tasks this May that'll pay off in June
- First harvests: mitsuba
Mitsuba (Japanese parsley) is a shade-loving herb with trefoil leaves and a mild celery-parsley flavor. It is essential in Japanese cuisine for soups, salads, and garnishes.
Lonoke County, Arkansas is in USDA Zone 8a. The average last spring frost is March 22 and the first fall frost is November 5, giving you a growing season of approximately 228 days.
At an elevation of 1,126 feet, Lonoke County receives approximately 48.8 inches of rainfall annually with predominantly silt loam soil. Summer highs average 91°F, providing good warmth for Mitsuba during the growing season.
Lonoke County Soil Profile
Soil Type
Silt Loam
Soil pH
5.7-6.5
Drainage
Well Drained
Plant Planting Risk Windows
Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.
Soil Compatibility in Lonoke County
How your county's soil matches Mitsuba's growing requirements.
Soil pH
Your soil pH (5.7–6.5) overlaps with Mitsuba's range (6.0–7.0), though not a perfect match.
Soil Texture
The silt loam soil in Lonoke County is excellent for Mitsuba — good drainage, moisture retention, and nutrient holding capacity.
Organic Matter
Organic matter is moderate (2.5%). Annual compost additions will help Mitsuba.
How to Plant Mitsuba
Fall planting: Sow 10 weeks before your first frost date for a fall harvest.
Succession Planting Mitsuba
Sow every 5.7 weeks. Last sowing by Aug 27 to harvest before frost.
For a dedicated fall crop, sow by Aug 27.
Plant Water Budget
Monthly Watering Guide for Mitsuba
Mitsuba needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.
| Month | Mitsuba Needs | Rainfall | You Supplement | Action |
|---|---|---|---|---|
| Jan | — | 4.3" | 0" | ❄️ Dormant |
| Feb | — | 4" | 0" | ❄️ Dormant |
| Mar | 4.3" | 4.2" | 0.1" | 💧 Light watering |
| Apr | 4.3" | 3.7" | 0.6" | 💧 Light watering |
| May | 4.3" | 4.3" | 0" | ✅ Rainfall sufficient |
| Jun | 4.3" | 3.6" | 0.7" | 💧 Light watering |
| Jul | 4.3" | 5.4" | 0" | ✅ Rainfall sufficient |
| Aug | 4.3" | 4.6" | 0" | ✅ Rainfall sufficient |
| Sep | 4.3" | 4" | 0.3" | 💧 Light watering |
| Oct | 4.3" | 2.8" | 1.5" | 💧 Light watering |
| Nov | 4.3" | 3.7" | 0.6" | 💧 Light watering |
| Dec | — | 4.1" | 0" | ❄️ Dormant |
Water needs are for active growing months only (Mar–Nov in Lonoke County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.
Mitsuba Heat Requirements (GDD)
What are Growing Degree Days (GDD)?
Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" — every day above 50°F deposits warmth that helps your plants grow.
Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.
Mitsuba Planting Timeline — Lonoke County, AR
Mitsuba Planting Calendar
| Activity | When | Date Range |
|---|---|---|
| Start Indoors | February 15 | Feb 15 – Mar 1 |
| Transplant Outdoors | March 15 | Mar 15 – Mar 29 |
| Direct Sow | March 8 | Mar 8 – Mar 29 |
| Harvest | May 10 | May 10 – Jul 5 |
| Fall Sowing | August 27 | Aug 27 – Sep 10 |
Plant 0.5" deep · 8" apart · Rows 12" apart
Month-by-Month Timeline
| Month | Activities |
|---|---|
| January | — |
| February | Start Indoors |
| March | Start Indoors Transplant Outdoors Direct Sow |
| April | — |
| May | Harvest |
| June | Harvest |
| July | Harvest |
| August | Fall Sowing |
| September | Fall Sowing |
| October | — |
| November | — |
| December | — |
Growing Conditions
☀️ Sun
Partial Shade (3-6 hours)
💧 Water
1"/week · Only during dry spells
📅 Days to Maturity
50–70 days
🧪 Soil pH
Needs 6–7 · Your soil: acceptable
🗺️ USDA Zone
Zone 8a
📆 Growing Season
228 days in Lonoke County
Growing Tips for Mitsuba in Lonoke County
Direct sow Mitsuba outdoors after March 22 in Lonoke County when soil has warmed and frost danger has passed.
Common pests for Mitsuba in this region include carrot rust fly and parsleyworm. Use row covers early in the season and inspect plants weekly.
General growing tips
Direct sow or start indoors in partial shade. Mitsuba prefers cool, moist conditions. Harvest outer stems as needed. Self-sows readily in shaded garden areas.
Companion Planting
Good Companions
Check more plant combinations with our Companion Planting Checker →
Mitsuba in Other Locations
Frequently Asked Questions
When should I plant Mitsuba in Lonoke County, AR?
Lonoke County is in Zone 8a with an average last frost of March 22. Plan your Mitsuba planting based on this frost date — see the calendar above for exact timing.
What planting zone is Lonoke County, AR?
Lonoke County, Arkansas is in USDA Hardiness Zone 8a. The average last spring frost is March 22 and first fall frost is November 5.
Your Lonoke County Garden Planner — Free
A 24-page printable planner built for Lonoke County (Zone 8a). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.