Blog

When to Plant Patty Pan Squash in Faulkner County, AR

Faulkner County, Arkansas Zone 8a May

Top priorities for Faulkner County, Arkansas gardeners in May

Your Faulkner County, Arkansas garden is entering a new phase. Here's what's on the schedule for May and why each task matters now.

Avg. last frost March 26
Avg. first frost November 3
Soil temp (4") 70°F
Watering Low
Pest pressure Moderate
Daylight 13.8 hrs
  1. Collect patty pan squash at their peak

    Check every 1–2 days. Many of these get tough or go to seed if you wait too long.

Coming up in June — start thinking about
  • First harvests: patty pan squash

Instant PDF download. No spam, unsubscribe any time.

Patty pan squash is a summer squash with a distinctive flying-saucer shape and scalloped edges. It comes in white, yellow, and green varieties with a mild, nutty flavor.

Faulkner County, Arkansas is in USDA Zone 8a. The average last spring frost is March 26 and the first fall frost is November 3, giving you a growing season of approximately 222 days.

At an elevation of 211 feet, Faulkner County receives approximately 52.8 inches of rainfall annually with predominantly silt loam soil. Summer highs average 93°F, providing good warmth for Patty Pan Squash during the growing season. Ample rainfall means less supplemental watering, but ensure good drainage to prevent Patty Pan Squash root diseases.

Faulkner County, AR (Zone 8a) Long season
222 days
Last Spring Frost March 26
222 growing days
First Fall Frost November 3

Faulkner County Soil Profile

Soil Type

Silt Loam

Soil pH

5.7-6.8

Drainage

Well Drained

Plant Planting Risk Windows

Early Start (70% safe) ✓ Fits season (136 days to spare)
Start indoors: Feb 16 Transplant: Mar 30 🍅 Harvest: May 18 – Jun 15
Recommended (50%) ✓ Fits season (131 days to spare)
Start indoors: Feb 26 Transplant: Apr 9 🍅 Harvest: May 28 – Jun 25
Safe Start (90%) ✓ Fits season (132 days to spare)
Start indoors: Mar 18 Transplant: Apr 29 🍅 Harvest: Jun 17 – Jul 15

Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.

Soil Compatibility in Faulkner County

How your county's soil matches Patty Pan Squash's growing requirements.

Soil pH

Your soil pH (5.7–6.8) overlaps with Patty Pan Squash's range (6.0–7.5), though not a perfect match.

Soil Texture

The silt loam soil in Faulkner County is excellent for Patty Pan Squash — good drainage, moisture retention, and nutrient holding capacity.

Organic Matter

Organic matter is moderate (3.1%). Annual compost additions will help Patty Pan Squash.

How to Plant Patty Pan Squash

1"
Planting Depth
30"
Between Plants
42"
Between Rows

Succession Planting Patty Pan Squash

5
successive plantings in your 222-day season

Sow every 5.1 weeks. Last sowing by Sep 04 to harvest before frost.

Plant Water Budget

Plant needs
1.0″/week
Rainfall provides
1.0″/week
Watering frequency Only during dry spells
Season total 3 gal / 100 sq ft
Drought risk

Water stress score is 6/10 — consider drought-tolerant varieties and mulching

Monthly Watering Guide for Patty Pan Squash

Patty Pan Squash needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.

Month Patty Pan Squash Needs Rainfall You Supplement Action
Jan 4.7" 0" ❄️ Dormant
Feb 4.7" 0" ❄️ Dormant
Mar 4.3" 5.4" 0" ✅ Rainfall sufficient
Apr 4.3" 3.9" 0.4" 💧 Light watering
May 4.3" 4.6" 0" ✅ Rainfall sufficient
Jun 4.3" 4.8" 0" ✅ Rainfall sufficient
Jul 4.3" 5.1" 0" ✅ Rainfall sufficient
Aug 4.3" 4.6" 0" ✅ Rainfall sufficient
Sep 4.3" 3.7" 0.6" 💧 Light watering
Oct 4.3" 3.6" 0.7" 💧 Light watering
Nov 4.3" 4.1" 0.2" 💧 Light watering
Dec 3.5" 0" ❄️ Dormant

Water needs are for active growing months only (Mar–Nov in Faulkner County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.

Patty Pan Squash Heat Requirements (GDD)

What are Growing Degree Days (GDD)?

Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" — every day above 50°F deposits warmth that helps your plants grow.

Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.

Patty Pan Squash needs ~1,037 GDD — county provides 4,384 GDD Excellent fit

Patty Pan Squash Planting Timeline — Faulkner County, AR

Patty Pan Squash Planting Calendar

Activity When Date Range
Start Indoors February 26 Feb 26 – Mar 12
Transplant Outdoors April 9 Apr 9 – Apr 23
Direct Sow April 2 Apr 2 – Apr 23
Harvest May 28 May 28 – Jun 25

Plant 1" deep · 30" apart · Rows 42" apart

Month-by-Month Timeline

MonthActivities
January
February Start Indoors
March Start Indoors
April Transplant Outdoors Direct Sow
May Harvest
June Harvest
July
August
September
October
November
December

Growing Conditions

☀️ Sun

Full Sun (6-8+ hours)

💧 Water

1"/week · Only during dry spells

📅 Days to Maturity

45–60 days

🧪 Soil pH

Needs 6–7.5 · Your soil: acceptable

🗺️ USDA Zone

Zone 8a

📆 Growing Season

222 days in Faulkner County

Growing Tips for Patty Pan Squash in Faulkner County

Direct sow Patty Pan Squash outdoors after March 26 in Faulkner County when soil has warmed and frost danger has passed.

Your generous 222.0-day season in Faulkner County allows multiple plantings of Patty Pan Squash. Sow every 22.0 days for continuous harvest.

Common pests for Patty Pan Squash in this region include squash vine borer and cucumber beetles. Use row covers early in the season and inspect plants weekly.

General growing tips

Direct sow after last frost. Harvest when 2-4 inches across for best texture and flavor. Larger fruits become seedy and tough. Very prolific producers in warm weather.

Companion Planting

Good Companions

Avoid Planting Near

  • Potatoes

Check more plant combinations with our Companion Planting Checker →

Frequently Asked Questions

When should I plant Patty Pan Squash in Faulkner County, AR?

Faulkner County is in Zone 8a with an average last frost of March 26. Plan your Patty Pan Squash planting based on this frost date — see the calendar above for exact timing.

What planting zone is Faulkner County, AR?

Faulkner County, Arkansas is in USDA Hardiness Zone 8a. The average last spring frost is March 26 and first fall frost is November 3.

🌱

Your Faulkner County Garden Planner — Free

A 24-page printable planner built for Faulkner County (Zone 8a). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.

Instant PDF download. No spam, unsubscribe any time.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Faulkner County, AR. Local conditions may vary. Last updated: May 2026.

Sources & credits

Every number on this page traces back to a primary horticulture or government data source. Click through to verify.