Blog

When to Plant Jostaberry in Crittenden County, AR

Crittenden County, Arkansas Zone 8a May

Your May game plan for Crittenden County, Arkansas

A quick May briefing for Crittenden County, Arkansas gardeners — what's urgent, what's next, and what can wait.

Avg. last frost March 21
Avg. first frost November 5
Soil temp (4") 68°F
Watering Moderate
Pest pressure Moderate
Daylight 13.9 hrs

Instant PDF download. No spam, unsubscribe any time.

Jostaberry is a thornless hybrid of black currant and gooseberry, producing medium-sized, dark berries with a complex, tart-sweet flavor. It is vigorous and disease-resistant.

Crittenden County, Arkansas is in USDA Zone 8a. The average last spring frost is March 21 and the first fall frost is November 5, giving you a growing season of approximately 229 days.

At an elevation of 808 feet, Crittenden County receives approximately 45.1 inches of rainfall annually with predominantly silt loam soil. Summer highs average 93°F, providing good warmth for Jostaberry during the growing season.

Crittenden County, AR (Zone 8a) Long season
229 days
Last Spring Frost March 21
229 growing days
First Fall Frost November 5

Crittenden County Soil Profile

Soil Type

Silt Loam

Soil pH

5.7-6.5

Drainage

Well Drained

Plant Planting Risk Windows

Early Start (70% safe) ✓ Fits season
Transplant: Apr 4
Recommended (50%) ✓ Fits season
Transplant: Apr 11
Safe Start (90%) ✓ Fits season
Transplant: Apr 30

Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.

Soil Compatibility in Crittenden County

How your county's soil matches Jostaberry's growing requirements.

Soil pH

Your soil pH (5.7–6.5) overlaps with Jostaberry's range (6.0–6.5), though not a perfect match.

Soil Texture

The silt loam soil in Crittenden County is excellent for Jostaberry — good drainage, moisture retention, and nutrient holding capacity.

Organic Matter

Organic matter is moderate (2.5%). Annual compost additions will help Jostaberry.

How to Plant Jostaberry

48"
Between Plants
72"
Between Rows

Plant Water Budget

Plant needs
1.0″/week
Rainfall provides
0.8″/week
You supply
0.2″/week
Watering frequency Only during dry spells
Season total 423 gal / 100 sq ft
Drought risk

Water stress score is 6/10 — consider drought-tolerant varieties and mulching

Monthly Watering Guide for Jostaberry

Jostaberry needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.

Month Jostaberry Needs Rainfall You Supplement Action
Jan 4.2" 0" ❄️ Dormant
Feb 3.5" 0" ❄️ Dormant
Mar 4.3" 4.2" 0.1" 💧 Light watering
Apr 4.3" 3.3" 1" 💧 Light watering
May 4.3" 3.4" 0.9" 💧 Light watering
Jun 4.3" 3.5" 0.8" 💧 Light watering
Jul 4.3" 4.6" 0" ✅ Rainfall sufficient
Aug 4.3" 4.7" 0" ✅ Rainfall sufficient
Sep 4.3" 3.6" 0.7" 💧 Light watering
Oct 4.3" 2.4" 1.9" 💧 Light watering
Nov 4.3" 3.6" 0.7" 💧 Light watering
Dec 4" 0" ❄️ Dormant

Water needs are for active growing months only (Mar–Nov in Crittenden County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.

Jostaberry Heat Requirements (GDD)

What are Growing Degree Days (GDD)?

Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" — every day above 50°F deposits warmth that helps your plants grow.

Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.

Jostaberry needs ~18,022 GDD — county provides 4,522 GDD May not mature

Jostaberry Planting Timeline — Crittenden County, AR

Jostaberry Planting Calendar

Activity When Date Range
Transplant Outdoors April 11 Apr 11 – Apr 25

· 48" apart · Rows 72" apart

Month-by-Month Timeline

MonthActivities
January
February
March
April Transplant Outdoors
May
June
July
August
September
October
November
December

Growing Conditions

☀️ Sun

Partial Shade (3-6 hours)

💧 Water

1"/week · Only during dry spells

📅 Days to Maturity

730–1095 days

🧪 Soil pH

Needs 6–6.5 · Your soil: acceptable

🗺️ USDA Zone

Zone 8a

📆 Growing Season

229 days in Crittenden County

Growing Tips for Jostaberry in Crittenden County

Direct sow Jostaberry outdoors after March 21 in Crittenden County when soil has warmed and frost danger has passed.

Your 229.0-day growing season in Crittenden County is tight for Jostaberry (730.0-1095.0 days to maturity). Start indoors and choose early-maturing varieties.

General growing tips

Plant in rich, well-drained soil. No special pruning required beyond removing old wood. Self-fertile but yields improve with a second bush. Berries ripen midsummer.

Companion Planting

Good Companions

Check more plant combinations with our Companion Planting Checker →

Frequently Asked Questions

When should I plant Jostaberry in Crittenden County, AR?

Crittenden County is in Zone 8a with an average last frost of March 21. Plan your Jostaberry planting based on this frost date — see the calendar above for exact timing.

What planting zone is Crittenden County, AR?

Crittenden County, Arkansas is in USDA Hardiness Zone 8a. The average last spring frost is March 21 and first fall frost is November 5.

🌱

Your Crittenden County Garden Planner — Free

A 24-page printable planner built for Crittenden County (Zone 8a). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.

Instant PDF download. No spam, unsubscribe any time.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Crittenden County, AR. Local conditions may vary. Last updated: May 2026.

Sources & credits

Every number on this page traces back to a primary horticulture or government data source. Click through to verify.