Blog

When to Plant Komatsuna in Bradley County, AR

Bradley County, Arkansas Zone 8a May

May in Bradley County, Arkansas — your action list

Welcome to May in Zone 8a. These are the moves that will have the biggest impact on your growing season.

Avg. last frost March 22
Avg. first frost November 4
Soil temp (4") 73°F
Watering Low
Pest pressure High
Daylight 13.7 hrs
  1. Harvest komatsuna as they ripen

    Morning harvests are best — cooler temperatures mean crisper produce and longer fridge life.

Instant PDF download. No spam, unsubscribe any time.

Komatsuna (Japanese mustard spinach) is a versatile Asian green with glossy, dark leaves and a mild, sweet flavor. It is extremely cold-hardy and heat-tolerant.

Bradley County, Arkansas is in USDA Zone 8a. The average last spring frost is March 22 and the first fall frost is November 4, giving you a growing season of approximately 227 days.

At an elevation of 614 feet, Bradley County receives approximately 51.6 inches of rainfall annually with predominantly silt loam soil. Summer highs average 91°F, providing good warmth for Komatsuna during the growing season. Ample rainfall means less supplemental watering, but ensure good drainage to prevent Komatsuna root diseases.

Bradley County, AR (Zone 8a) Long season
227 days
Last Spring Frost March 22
227 growing days
First Fall Frost November 4
Share this guide:

Bradley County Soil Profile

Soil Type

Silt Loam

Soil pH

5.3-6.7

Drainage

Well Drained

Plant Planting Risk Windows

Early Start (70% safe) ✓ Fits season (160 days to spare)
Start indoors: Feb 6 Transplant: Mar 13 🍅 Harvest: Apr 17 – May 22
Recommended (50%) ✓ Fits season (157 days to spare)
Start indoors: Feb 15 Transplant: Mar 22 🍅 Harvest: Apr 26 – May 31
Safe Start (90%) ✓ Fits season (160 days to spare)
Start indoors: Mar 5 Transplant: Apr 9 🍅 Harvest: May 14 – Jun 18

Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.

Soil Compatibility in Bradley County

How your county's soil matches Komatsuna's growing requirements.

Soil pH

Your soil pH (5.3–6.7) overlaps with Komatsuna's range (6.0–7.5), though not a perfect match.

Soil Texture

The silt loam soil in Bradley County is excellent for Komatsuna — good drainage, moisture retention, and nutrient holding capacity.

Organic Matter

Organic matter is moderate (2.7%). Annual compost additions will help Komatsuna.

How to Plant Komatsuna

0.5"
Planting Depth
6"
Between Plants
12"
Between Rows

Fall planting: Sow 10 weeks before your first frost date for a fall harvest.

Succession Planting Komatsuna

7
successive plantings in your 227-day season

Sow every 4 weeks. Last sowing by Sep 15 to harvest before frost.

For a dedicated fall crop, sow by Aug 26.

Plant Water Budget

Plant needs
1.0″/week
Rainfall provides
1.0″/week
You supply
0.1″/week
Watering frequency Only during dry spells
Season total 91 gal / 100 sq ft

Monthly Watering Guide for Komatsuna

Komatsuna needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.

Month Komatsuna Needs Rainfall You Supplement Action
Jan 4" 0" ❄️ Dormant
Feb 3.7" 0" ❄️ Dormant
Mar 4.3" 5.4" 0" ✅ Rainfall sufficient
Apr 4.3" 4.1" 0.2" 💧 Light watering
May 4.3" 4.4" 0" ✅ Rainfall sufficient
Jun 4.3" 4.9" 0" ✅ Rainfall sufficient
Jul 4.3" 5" 0" ✅ Rainfall sufficient
Aug 4.3" 4.6" 0" ✅ Rainfall sufficient
Sep 4.3" 4.4" 0" ✅ Rainfall sufficient
Oct 4.3" 3.1" 1.2" 💧 Light watering
Nov 4.3" 3.4" 0.9" 💧 Light watering
Dec 4.6" 0" ❄️ Dormant

Water needs are for active growing months only (Mar–Nov in Bradley County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.

Komatsuna Heat Requirements (GDD)

What are Growing Degree Days (GDD)?

Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" — every day above 50°F deposits warmth that helps your plants grow.

Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.

Komatsuna needs ~776 GDD — county provides 4,142 GDD Excellent fit

Komatsuna Planting Timeline — Bradley County, AR

Komatsuna Planting Calendar

Activity When Date Range
Start Indoors February 15 Feb 15 – Mar 1
Transplant Outdoors March 22 Mar 22 – Apr 5
Direct Sow March 8 Mar 8 – Mar 29
Harvest April 26 Apr 26 – May 31
Fall Sowing August 26 Aug 26 – Sep 9

Plant 0.5" deep · 6" apart · Rows 12" apart

Month-by-Month Timeline

MonthActivities
January
February Start Indoors
March Start Indoors Transplant Outdoors Direct Sow
April Transplant Outdoors Harvest
May Harvest
June
July
August Fall Sowing
September Fall Sowing
October
November
December
Share this guide:

Growing Conditions

☀️ Sun

Partial Shade (3-6 hours)

💧 Water

1"/week · Only during dry spells

📅 Days to Maturity

35–50 days

🧪 Soil pH

Needs 6–7.5 · Your soil: acceptable

🗺️ USDA Zone

Zone 8a

📆 Growing Season

227 days in Bradley County

Growing Tips for Komatsuna in Bradley County

Direct sow Komatsuna outdoors after March 22 in Bradley County when soil has warmed and frost danger has passed.

Your generous 227.0-day season in Bradley County allows multiple plantings of Komatsuna. Sow every 17.0 days for continuous harvest.

Common pests for Komatsuna in this region include cabbage worm and flea beetles. Use row covers early in the season and inspect plants weekly.

General growing tips

Direct sow in spring or fall. One of the most forgiving Asian greens for all seasons. Harvest outer leaves or cut whole plants. Excellent for stir-fries, soups, or salads.

Companion Planting

Good Companions

Avoid Planting Near

  • Strawberries

Check more plant combinations with our Companion Planting Checker →

Frequently Asked Questions

When should I plant Komatsuna in Bradley County, AR?

Bradley County is in Zone 8a with an average last frost of March 22. Plan your Komatsuna planting based on this frost date — see the calendar above for exact timing.

What planting zone is Bradley County, AR?

Bradley County, Arkansas is in USDA Hardiness Zone 8a. The average last spring frost is March 22 and first fall frost is November 4.

🌱

Your Bradley County Garden Planner — Free

A 24-page printable planner built for Bradley County (Zone 8a). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.

Instant PDF download. No spam, unsubscribe any time.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Bradley County, AR. Local conditions may vary. Last updated: May 2026.

Sources & credits

Every number on this page traces back to a primary horticulture or government data source. Click through to verify.