When to Plant Tatsoi in Cleburne County, AL
Top priorities for Cleburne County, Alabama gardeners in May
If you only do a handful of things in the garden this May, make it these. They're sequenced around your zone's frost timing.
-
Get tatsoi seeds going inside
Label every cell. You will absolutely forget which is which otherwise.
-
Start harvesting tatsoi
This is the payoff month. Bring a basket, bring a friend, and get into the beds.
Coming up in June — start thinking about
- First harvests: tatsoi
Tatsoi is a compact Asian green forming beautiful rosettes of dark, spoon-shaped leaves with a mild mustard flavor. It is extremely cold-hardy and versatile.
Cleburne County, Alabama is in USDA Zone 8a. The average last spring frost is April 1 and the first fall frost is November 1, giving you a growing season of approximately 214 days.
At an elevation of 207 feet, Cleburne County receives approximately 57.8 inches of rainfall annually with predominantly clay loam soil. Summer highs average 91°F, providing good warmth for Tatsoi during the growing season. Clay soil retains moisture well for Tatsoi, but amend with compost to improve drainage and prevent root rot. Ample rainfall means less supplemental watering, but ensure good drainage to prevent Tatsoi root diseases.
Cleburne County Soil Profile
Soil Type
Clay Loam
Soil pH
5.5-6.6
Drainage
Well Drained
Plant Planting Risk Windows
Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.
Soil Compatibility in Cleburne County
How your county's soil matches Tatsoi's growing requirements.
Soil pH
Your soil pH (5.5–6.6) overlaps with Tatsoi's range (6.0–7.5), though not a perfect match.
Soil Texture
The clay loam soil in Cleburne County is excellent for Tatsoi — good drainage, moisture retention, and nutrient holding capacity.
Organic Matter
Organic matter is moderate (2.6%). Annual compost additions will help Tatsoi.
How to Plant Tatsoi
Fall planting: Sow 10 weeks before your first frost date for a fall harvest.
Succession Planting Tatsoi
Sow every 4 weeks. Last sowing by Sep 12 to harvest before frost.
For a dedicated fall crop, sow by Aug 23.
Plant Water Budget
Monthly Watering Guide for Tatsoi
Tatsoi needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.
| Month | Tatsoi Needs | Rainfall | You Supplement | Action |
|---|---|---|---|---|
| Jan | — | 4.9" | 0" | ❄️ Dormant |
| Feb | — | 3.9" | 0" | ❄️ Dormant |
| Mar | — | 6.1" | 0" | ❄️ Dormant |
| Apr | 4.3" | 4.3" | 0" | ✅ Rainfall sufficient |
| May | 4.3" | 4.8" | 0" | ✅ Rainfall sufficient |
| Jun | 4.3" | 5.9" | 0" | ✅ Rainfall sufficient |
| Jul | 4.3" | 5.6" | 0" | ✅ Rainfall sufficient |
| Aug | 4.3" | 5.5" | 0" | ✅ Rainfall sufficient |
| Sep | 4.3" | 3.9" | 0.4" | 💧 Light watering |
| Oct | 4.3" | 3.8" | 0.5" | 💧 Light watering |
| Nov | 4.3" | 4.4" | 0" | ✅ Rainfall sufficient |
| Dec | — | 4.7" | 0" | ❄️ Dormant |
Water needs are for active growing months only (Apr–Nov in Cleburne County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.
Tatsoi Heat Requirements (GDD)
What are Growing Degree Days (GDD)?
Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" — every day above 50°F deposits warmth that helps your plants grow.
Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.
Tatsoi Planting Timeline — Cleburne County, AL
Tatsoi Planting Calendar
| Activity | When | Date Range |
|---|---|---|
| Start Indoors | February 25 | Feb 25 – Mar 11 |
| Transplant Outdoors | April 1 | Apr 1 – Apr 15 |
| Direct Sow | March 18 | Mar 18 – Apr 8 |
| Harvest | May 6 | May 6 – Jun 10 |
| Fall Sowing | August 23 | Aug 23 – Sep 6 |
Plant 0.5" deep · 6" apart · Rows 12" apart
Month-by-Month Timeline
| Month | Activities |
|---|---|
| January | — |
| February | Start Indoors |
| March | Start Indoors Direct Sow |
| April | Transplant Outdoors Direct Sow |
| May | Harvest |
| June | Harvest |
| July | — |
| August | Fall Sowing |
| September | Fall Sowing |
| October | — |
| November | — |
| December | — |
Growing Conditions
☀️ Sun
Partial Shade (3-6 hours)
💧 Water
1"/week · Natural rainfall sufficient
📅 Days to Maturity
35–50 days
🧪 Soil pH
Needs 6–7.5 · Your soil: acceptable
🗺️ USDA Zone
Zone 8a
📆 Growing Season
214 days in Cleburne County
Growing Tips for Tatsoi in Cleburne County
Direct sow Tatsoi outdoors after April 01 in Cleburne County when soil has warmed and frost danger has passed.
With Cleburne County's clay soil (26% clay), work in 3-4 inches of compost before planting Tatsoi. Avoid tilling when soil is wet to prevent compaction.
Your generous 214.0-day season in Cleburne County allows multiple plantings of Tatsoi. Sow every 17.0 days for continuous harvest.
Common pests for Tatsoi in this region include cabbage worm and flea beetles. Use row covers early in the season and inspect plants weekly.
General growing tips
Direct sow in spring or fall. Tatsoi tolerates frost down to 15F. Harvest outer leaves or cut whole rosettes. Excellent in salads, stir-fries, or lightly wilted.
Companion Planting
Good Companions
Avoid Planting Near
Check more plant combinations with our Companion Planting Checker →
Tatsoi in Other Locations
Frequently Asked Questions
When should I plant Tatsoi in Cleburne County, AL?
Cleburne County is in Zone 8a with an average last frost of April 1. Plan your Tatsoi planting based on this frost date — see the calendar above for exact timing.
What planting zone is Cleburne County, AL?
Cleburne County, Alabama is in USDA Hardiness Zone 8a. The average last spring frost is April 1 and first fall frost is November 1.
Your Cleburne County Garden Planner — Free
A 24-page printable planner built for Cleburne County (Zone 8a). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.