Blog

When to Plant Shiso in Bates County, MO

Shiso (perilla) is a fragrant Japanese herb with large, ruffled leaves in green or purple varieties. It has a unique flavor combining mint, basil, and anise.

Bates County, Missouri is in USDA Zone 6a. The average last spring frost is April 9 and the first fall frost is October 25, giving you a growing season of approximately 199 days.

At an elevation of 1,397 feet, Bates County receives approximately 39 inches of rainfall annually with predominantly silt loam soil. Summer highs average 86ยฐF, providing good warmth for Shiso during the growing season.

Bates County, MO (Zone 6a) Moderate season
199 days
Last Spring Frost April 9
199 growing days
First Fall Frost October 25

Bates County Soil Profile

Soil Type

Silt Loam

Soil pH

5.4-6.8

Drainage

Well Drained

Plant Planting Risk Windows

Early Start (70% safe) ✓ Fits season (73 days to spare)
Start indoors: Feb 12 Transplant: Apr 16 🍅 Harvest: Jun 11 – Aug 6
Recommended (50%) ✓ Fits season (73 days to spare)
Start indoors: Feb 19 Transplant: Apr 23 🍅 Harvest: Jun 18 – Aug 13
Safe Start (90%) ✓ Fits season (74 days to spare)
Start indoors: Mar 1 Transplant: May 3 🍅 Harvest: Jun 28 – Aug 23

Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.

Soil Compatibility in Bates County

How your county's soil matches Shiso's growing requirements.

Soil pH

Your soil pH (5.4โ€“6.8) overlaps with Shiso's range (5.5โ€“7.0), though not a perfect match.

Soil Texture

The silt loam soil in Bates County is excellent for Shiso โ€” good drainage, moisture retention, and nutrient holding capacity.

Drainage

Drainage is adequate for Shiso.

Organic Matter

Organic matter is moderate (3.0%). Annual compost additions will help Shiso.

How to Plant Shiso

0.5"
Planting Depth
8"
Between Plants
12"
Between Rows

Succession Planting Shiso

4
successive plantings in your 199-day season

Sow every 5.7 weeks. Last sowing by Aug 16 to harvest before frost.

Plant Water Budget

Plant needs
1.0″/week
Rainfall provides
0.8″/week
Watering frequency Natural rainfall sufficient
Season total 0 gal / 100 sq ft
Drought risk

Water stress score is 6/10 โ€” consider drought-tolerant varieties and mulching

Monthly Watering Guide for Shiso

Shiso needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.

Month Shiso Needs Rainfall You Supplement Action
Jan โ€” 1.6" 0" โ„๏ธ Dormant
Feb โ€” 2" 0" โ„๏ธ Dormant
Mar โ€” 3.2" 0" โ„๏ธ Dormant
Apr 4.3" 4.4" 0" โœ… Rainfall sufficient
May 4.3" 4.1" 0.2" ๐Ÿ’ง Light watering
Jun 4.3" 4.8" 0" โœ… Rainfall sufficient
Jul 4.3" 3.9" 0.4" ๐Ÿ’ง Light watering
Aug 4.3" 3.9" 0.4" ๐Ÿ’ง Light watering
Sep 4.3" 3.2" 1.1" ๐Ÿ’ง Light watering
Oct 4.3" 2.9" 1.4" ๐Ÿ’ง Light watering
Nov โ€” 2.9" 0" โ„๏ธ Dormant
Dec โ€” 2.1" 0" โ„๏ธ Dormant

Water needs are for active growing months only (Aprโ€“Oct in Bates County). Supplement amounts are based on average rainfall โ€” actual needs vary with temperature, soil, and mulching.

Shiso Heat Requirements (GDD)

What are Growing Degree Days (GDD)?

Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" โ€” every day above 50ยฐF deposits warmth that helps your plants grow.

Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.

Shiso needs ~870 GDD — county provides 2,885 GDD Excellent fit

Shiso Planting Timeline โ€” Bates County, MO

Shiso Planting Calendar

Activity When Date Range
Start Indoors February 19 Feb 19 โ€“ Mar 5
Transplant Outdoors April 23 Apr 23 โ€“ May 7
Direct Sow April 16 Apr 16 โ€“ May 7
Harvest June 18 Jun 18 โ€“ Aug 13

Plant 0.5" deep ยท 8" apart ยท Rows 12" apart

Month-by-Month Timeline

MonthActivities
January โ€”
February Start Indoors
March Start Indoors
April Transplant Outdoors Direct Sow
May Transplant Outdoors Direct Sow
June Harvest
July Harvest
August Harvest
September โ€”
October โ€”
November โ€”
December โ€”

Growing Conditions

โ˜€๏ธ Sun

Partial Shade (3-6 hours)

๐Ÿ’ง Water

1"/week ยท Natural rainfall sufficient

๐Ÿ“… Days to Maturity

50โ€“70 days

๐Ÿงช Soil pH

Needs 5.5โ€“7 ยท Your soil: acceptable

๐Ÿ—บ๏ธ USDA Zone

Zone 6a

๐Ÿ“† Growing Season

199 days in Bates County

Growing Tips for Shiso in Bates County

Direct sow Shiso outdoors after April 09 in Bates County when soil has warmed and frost danger has passed.

General growing tips

Direct sow after last frost or start indoors. Both green and red varieties are available. Pinch tips to encourage bushiness. Self-sows prolifically; deadhead to control.

Companion Planting

Good Companions

Check more plant combinations with our Companion Planting Checker →

Frequently Asked Questions

When should I plant Shiso in Bates County, MO?

Bates County is in Zone 6a with an average last frost of April 9. Plan your Shiso planting based on this frost date โ€” see the calendar above for exact timing.

What planting zone is Bates County, MO?

Bates County, Missouri is in USDA Hardiness Zone 6a. The average last spring frost is April 9 and first fall frost is October 25.

๐ŸŒฑ

Plan Your Garden with Confidence

Get our free Garden Planner โ€” designed to help Bates County gardeners in Zone 6a organize planting dates, track what's growing, and never miss a planting window.

Get Your Free Garden Planner →

Free download. Plan your entire garden season in minutes.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Bates County, MO. Local conditions may vary. Last updated: April 2026.