When to Plant Scallions in Wright County, MO
Scallions (green onions) are mild-flavored alliums harvested for their slender green tops and white bases. They are quick-growing and perfect for succession planting.
Wright County, Missouri is in USDA Zone 6a. The average last spring frost is April 11 and the first fall frost is October 22, giving you a growing season of approximately 194 days.
At an elevation of 923 feet, Wright County receives approximately 32.4 inches of rainfall annually with predominantly silt loam soil. Summer highs average 86ยฐF, providing good warmth for Scallions during the growing season.
Wright County Soil Profile
Soil Type
Silt Loam
Soil pH
5.5-7
Drainage
Well Drained
Plant Planting Risk Windows
Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.
Soil Compatibility in Wright County
How your county's soil matches Scallions's growing requirements.
Soil pH
Your soil pH (5.5โ7.0) overlaps with Scallions's range (6.0โ7.0), though not a perfect match.
Soil Texture
The silt loam soil in Wright County is excellent for Scallions โ good drainage, moisture retention, and nutrient holding capacity.
Organic Matter
Organic matter is moderate (2.8%). Annual compost additions will help Scallions.
How to Plant Scallions
Fall planting: Sow 10 weeks before your first frost date for a fall harvest.
Succession Planting Scallions
Sow every 5.7 weeks. Last sowing by Aug 13 to harvest before frost.
For a dedicated fall crop, sow by Aug 13.
Plant Water Budget
Water stress score is 6/10 โ consider drought-tolerant varieties and mulching
Monthly Watering Guide for Scallions
Scallions needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.
| Month | Scallions Needs | Rainfall | You Supplement | Action |
|---|---|---|---|---|
| Jan | โ | 1.3" | 0" | โ๏ธ Dormant |
| Feb | โ | 1.6" | 0" | โ๏ธ Dormant |
| Mar | โ | 2.2" | 0" | โ๏ธ Dormant |
| Apr | 4.3" | 3" | 1.3" | ๐ง Light watering |
| May | 4.3" | 4" | 0.3" | ๐ง Light watering |
| Jun | 4.3" | 3.9" | 0.4" | ๐ง Light watering |
| Jul | 4.3" | 3.5" | 0.8" | ๐ง Light watering |
| Aug | 4.3" | 3.5" | 0.8" | ๐ง Light watering |
| Sep | 4.3" | 2.5" | 1.8" | ๐ง Light watering |
| Oct | 4.3" | 2.5" | 1.8" | ๐ง Light watering |
| Nov | โ | 2.5" | 0" | โ๏ธ Dormant |
| Dec | โ | 2" | 0" | โ๏ธ Dormant |
Water needs are for active growing months only (AprโOct in Wright County). Supplement amounts are based on average rainfall โ actual needs vary with temperature, soil, and mulching.
Scallions Heat Requirements (GDD)
What are Growing Degree Days (GDD)?
Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" โ every day above 50ยฐF deposits warmth that helps your plants grow.
Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.
Scallions Planting Timeline โ Wright County, MO
Scallions Planting Calendar
| Activity | When | Date Range |
|---|---|---|
| Start Indoors | March 7 | Mar 7 โ Mar 21 |
| Transplant Outdoors | April 11 | Apr 11 โ Apr 25 |
| Direct Sow | March 28 | Mar 28 โ Apr 18 |
| Harvest | June 6 | Jun 6 โ Jul 4 |
| Fall Sowing | August 13 | Aug 13 โ Aug 27 |
Plant 0.5" deep ยท 6" apart ยท Rows 12" apart
Month-by-Month Timeline
| Month | Activities |
|---|---|
| January | โ |
| February | โ |
| March | Start Indoors Direct Sow |
| April | Transplant Outdoors Direct Sow |
| May | โ |
| June | Harvest |
| July | Harvest |
| August | Fall Sowing |
| September | โ |
| October | โ |
| November | โ |
| December | โ |
Growing Conditions
โ๏ธ Sun
Full Sun (6-8+ hours)
๐ง Water
1"/week ยท 1-2 times/week
๐ Days to Maturity
50โ70 days
๐งช Soil pH
Needs 6โ7 ยท Your soil: acceptable
๐บ๏ธ USDA Zone
Zone 6a
๐ Growing Season
194 days in Wright County
Growing Tips for Scallions in Wright County
Direct sow Scallions outdoors after April 11 in Wright County when soil has warmed and frost danger has passed.
Common pests for Scallions in this region include onion maggots and thrips. Use row covers early in the season and inspect plants weekly.
General growing tips
Direct sow every 3 weeks for continuous harvest. Thin to 1 inch apart or grow in clusters. Harvest when pencil-thick by pulling or cutting at soil level.
Companion Planting
Good Companions
Avoid Planting Near
Check more plant combinations with our Companion Planting Checker →
Scallions in Other Locations
Frequently Asked Questions
When should I plant Scallions in Wright County, MO?
Wright County is in Zone 6a with an average last frost of April 11. Plan your Scallions planting based on this frost date โ see the calendar above for exact timing.
What planting zone is Wright County, MO?
Wright County, Missouri is in USDA Hardiness Zone 6a. The average last spring frost is April 11 and first fall frost is October 22.
Plan Your Garden with Confidence
Get our free Garden Planner โ designed to help Wright County gardeners in Zone 6a organize planting dates, track what's growing, and never miss a planting window.
Get Your Free Garden Planner →Free download. Plan your entire garden season in minutes.