Blog

When to Plant Rue in Grady County, OK

Rue is a bitter, aromatic perennial herb with bluish-green foliage used historically in medicine and as a pest deterrent. Handle with care as its sap can cause skin irritation.

Grady County, Oklahoma is in USDA Zone 7a. The average last spring frost is April 2 and the first fall frost is November 5, giving you a growing season of approximately 217 days.

At an elevation of 599 feet, Grady County receives approximately 29.8 inches of rainfall annually with predominantly loam soil. Summer highs average 89ยฐF, providing good warmth for Rue during the growing season.

Grady County, OK (Zone 7a) Long season
217 days
Last Spring Frost April 2
217 growing days
First Fall Frost November 5

Grady County Soil Profile

Soil Type

Loam

Soil pH

6.2-7.2

Drainage

Well Drained

Plant Planting Risk Windows

Early Start (70% safe) ✓ Fits season (82 days to spare)
Transplant: Mar 28 🍅 Harvest: Jun 6 – Aug 8
Recommended (50%) ✓ Fits season (77 days to spare)
Transplant: Apr 9 🍅 Harvest: Jun 18 – Aug 20
Safe Start (90%) ✓ Fits season (80 days to spare)
Transplant: Apr 22 🍅 Harvest: Jul 1 – Sep 2

Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.

Soil Compatibility in Grady County

How your county's soil matches Rue's growing requirements.

Soil pH

Your soil pH (6.2โ€“7.2) is within Rue's preferred range (6.0โ€“7.5).

Soil Texture

The loam soil in Grady County is excellent for Rue โ€” good drainage, moisture retention, and nutrient holding capacity.

Organic Matter

Organic matter is moderate (3.5%). Annual compost additions will help Rue.

How to Plant Rue

0.5"
Planting Depth
8"
Between Plants
12"
Between Rows

Succession Planting Rue

3
successive plantings in your 217-day season

Sow every 8 weeks. Last sowing by Aug 07 to harvest before frost.

Plant Water Budget

Plant needs
0.5″/week
Rainfall provides
0.6″/week
Watering frequency Natural rainfall sufficient
Season total 0 gal / 100 sq ft
Drought risk

Water stress score is 6/10 โ€” consider drought-tolerant varieties and mulching

Monthly Watering Guide for Rue

Rue needs approximately 0.5 inches of water per week (2.2" per month). Here's how your county's rainfall compares month by month.

Month Rue Needs Rainfall You Supplement Action
Jan โ€” 0.6" 0" โ„๏ธ Dormant
Feb โ€” 1" 0" โ„๏ธ Dormant
Mar โ€” 2" 0" โ„๏ธ Dormant
Apr 2.2" 2.8" 0" โœ… Rainfall sufficient
May 2.2" 4.9" 0" โœ… Rainfall sufficient
Jun 2.2" 4.3" 0" โœ… Rainfall sufficient
Jul 2.2" 4.2" 0" โœ… Rainfall sufficient
Aug 2.2" 3.2" 0" โœ… Rainfall sufficient
Sep 2.2" 2.8" 0" โœ… Rainfall sufficient
Oct 2.2" 2.1" 0.1" ๐Ÿ’ง Light watering
Nov 2.2" 1.1" 1.1" ๐Ÿšฟ Regular watering
Dec โ€” 0.7" 0" โ„๏ธ Dormant

Water needs are for active growing months only (Aprโ€“Nov in Grady County). Supplement amounts are based on average rainfall โ€” actual needs vary with temperature, soil, and mulching.

Rue Heat Requirements (GDD)

What are Growing Degree Days (GDD)?

Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" โ€” every day above 50ยฐF deposits warmth that helps your plants grow.

Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.

Rue needs ~1,340 GDD — county provides 3,634 GDD Excellent fit

Rue Planting Timeline โ€” Grady County, OK

Rue Planting Calendar

Activity When Date Range
Transplant Outdoors April 9 Apr 9 โ€“ Apr 23
Harvest June 18 Jun 18 โ€“ Aug 20

Plant 0.5" deep ยท 8" apart ยท Rows 12" apart

Month-by-Month Timeline

MonthActivities
January โ€”
February โ€”
March โ€”
April Transplant Outdoors
May โ€”
June Harvest
July Harvest
August Harvest
September โ€”
October โ€”
November โ€”
December โ€”

Growing Conditions

โ˜€๏ธ Sun

Full Sun (6-8+ hours)

๐Ÿ’ง Water

0.5"/week ยท Natural rainfall sufficient

๐Ÿ“… Days to Maturity

70โ€“90 days

๐Ÿงช Soil pH

Needs 6โ€“7.5 ยท Your soil: ideal

๐Ÿ—บ๏ธ USDA Zone

Zone 7a

๐Ÿ“† Growing Season

217 days in Grady County

Growing Tips for Rue in Grady County

Direct sow Rue outdoors after April 02 in Grady County when soil has warmed and frost danger has passed.

General growing tips

Start seeds indoors or direct sow. Plant in well-drained soil. Wear gloves when handling as sap can cause phytophotodermatitis. Prune in early spring.

Companion Planting

Good Companions

Avoid Planting Near

  • Basil
  • Sage

Check more plant combinations with our Companion Planting Checker →

Frequently Asked Questions

When should I plant Rue in Grady County, OK?

Grady County is in Zone 7a with an average last frost of April 2. Plan your Rue planting based on this frost date โ€” see the calendar above for exact timing.

What planting zone is Grady County, OK?

Grady County, Oklahoma is in USDA Hardiness Zone 7a. The average last spring frost is April 2 and first fall frost is November 5.

๐ŸŒฑ

Plan Your Garden with Confidence

Get our free Garden Planner โ€” designed to help Grady County gardeners in Zone 7a organize planting dates, track what's growing, and never miss a planting window.

Get Your Free Garden Planner →

Free download. Plan your entire garden season in minutes.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Grady County, OK. Local conditions may vary. Last updated: April 2026.