Blog

When to Plant Medlar in Webster County, MO

Medlar is a small ornamental tree producing unusual open-ended fruits that must be bletted (softened by frost) before eating. The flavor is complex, like spiced apple butter.

Webster County, Missouri is in USDA Zone 6a. The average last spring frost is April 11 and the first fall frost is October 22, giving you a growing season of approximately 194 days.

At an elevation of 1,274 feet, Webster County receives approximately 38.4 inches of rainfall annually with predominantly silt loam soil. Summer highs average 89ยฐF, providing good warmth for Medlar during the growing season.

Webster County, MO (Zone 6a) Moderate season
194 days
Last Spring Frost April 11
194 growing days
First Fall Frost October 22

Webster County Soil Profile

Soil Type

Silt Loam

Soil pH

5.6-6.6

Drainage

Well Drained

Plant Planting Risk Windows

Early Start (70% safe) ✓ Fits season
Transplant: Apr 26
Recommended (50%) ✓ Fits season
Transplant: May 2
Safe Start (90%) ✓ Fits season
Transplant: May 14

Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.

Soil Compatibility in Webster County

How your county's soil matches Medlar's growing requirements.

Soil pH

Your soil pH (5.6โ€“6.6) overlaps with Medlar's range (6.0โ€“7.5), though not a perfect match.

Soil Texture

The silt loam soil in Webster County is excellent for Medlar โ€” good drainage, moisture retention, and nutrient holding capacity.

Drainage

Drainage is adequate for Medlar.

Organic Matter

Organic matter is moderate (2.6%). Annual compost additions will help Medlar.

How to Plant Medlar

120"
Between Plants
144"
Between Rows

Plant Water Budget

Plant needs
1.0″/week
Rainfall provides
0.8″/week
Watering frequency Natural rainfall sufficient
Season total 0 gal / 100 sq ft

Monthly Watering Guide for Medlar

Medlar needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.

Month Medlar Needs Rainfall You Supplement Action
Jan โ€” 1.6" 0" โ„๏ธ Dormant
Feb โ€” 1.5" 0" โ„๏ธ Dormant
Mar โ€” 2.8" 0" โ„๏ธ Dormant
Apr 4.3" 4.2" 0.1" ๐Ÿ’ง Light watering
May 4.3" 5" 0" โœ… Rainfall sufficient
Jun 4.3" 4.2" 0.1" ๐Ÿ’ง Light watering
Jul 4.3" 4.4" 0" โœ… Rainfall sufficient
Aug 4.3" 4.4" 0" โœ… Rainfall sufficient
Sep 4.3" 3" 1.3" ๐Ÿ’ง Light watering
Oct 4.3" 3" 1.3" ๐Ÿ’ง Light watering
Nov โ€” 2.4" 0" โ„๏ธ Dormant
Dec โ€” 1.8" 0" โ„๏ธ Dormant

Water needs are for active growing months only (Aprโ€“Oct in Webster County). Supplement amounts are based on average rainfall โ€” actual needs vary with temperature, soil, and mulching.

Medlar Heat Requirements (GDD)

What are Growing Degree Days (GDD)?

Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" โ€” every day above 50ยฐF deposits warmth that helps your plants grow.

Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.

Medlar needs ~24,455 GDD — county provides 3,249 GDD May not mature

Medlar Planting Timeline โ€” Webster County, MO

Medlar Planting Calendar

Activity When Date Range
Transplant Outdoors May 2 May 2 โ€“ May 16

ยท 120" apart ยท Rows 144" apart

Month-by-Month Timeline

MonthActivities
January โ€”
February โ€”
March โ€”
April โ€”
May Transplant Outdoors
June โ€”
July โ€”
August โ€”
September โ€”
October โ€”
November โ€”
December โ€”

Growing Conditions

โ˜€๏ธ Sun

Full Sun (6-8+ hours)

๐Ÿ’ง Water

1"/week ยท Natural rainfall sufficient

๐Ÿ“… Days to Maturity

1095โ€“1825 days

๐Ÿงช Soil pH

Needs 6โ€“7.5 ยท Your soil: acceptable

๐Ÿ—บ๏ธ USDA Zone

Zone 6a

๐Ÿ“† Growing Season

194 days in Webster County

Growing Tips for Medlar in Webster County

Direct sow Medlar outdoors after April 11 in Webster County when soil has warmed and frost danger has passed.

Your 194.0-day growing season in Webster County is tight for Medlar (1095.0-1825.0 days to maturity). Start indoors and choose early-maturing varieties.

General growing tips

Plant in well-drained soil. Medlars are self-fertile and need minimal pruning. Harvest after the first frost and allow to soften (blet) indoors for 2-3 weeks before eating.

Companion Planting

Good Companions

Check more plant combinations with our Companion Planting Checker →

Frequently Asked Questions

When should I plant Medlar in Webster County, MO?

Webster County is in Zone 6a with an average last frost of April 11. Plan your Medlar planting based on this frost date โ€” see the calendar above for exact timing.

What planting zone is Webster County, MO?

Webster County, Missouri is in USDA Hardiness Zone 6a. The average last spring frost is April 11 and first fall frost is October 22.

๐ŸŒฑ

Plan Your Garden with Confidence

Get our free Garden Planner โ€” designed to help Webster County gardeners in Zone 6a organize planting dates, track what's growing, and never miss a planting window.

Get Your Free Garden Planner →

Free download. Plan your entire garden season in minutes.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Webster County, MO. Local conditions may vary. Last updated: April 2026.