When to Plant Mache in Clark County, WA
Mache (corn salad) is a cold-hardy salad green with small, rounded, tender leaves and a mild, nutty flavor. It thrives in cool weather and even overwinters in many climates.
Clark County, Washington is in USDA Zone 8a. The average last spring frost is April 14 and the first fall frost is October 27, giving you a growing season of approximately 196 days.
At an elevation of 482 feet, Clark County receives approximately 39.9 inches of rainfall annually with predominantly silt loam soil. Summer highs average 85ยฐF, providing good warmth for Mache during the growing season.
Clark County Soil Profile
Soil Type
Silt Loam
Soil pH
5.4-6.3
Drainage
Well Drained
Plant Planting Risk Windows
Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.
Soil Compatibility in Clark County
How your county's soil matches Mache's growing requirements.
Soil pH
Your soil pH (5.4โ6.3) is more acidic than Mache prefers (6.0โ7.5). Add garden lime to raise pH.
Soil Texture
The silt loam soil in Clark County is excellent for Mache โ good drainage, moisture retention, and nutrient holding capacity.
Drainage
Drainage is adequate for Mache.
Organic Matter
Organic matter is excellent (4.8%) โ Mache will thrive.
How to Plant Mache
Fall planting: Sow 10 weeks before your first frost date for a fall harvest.
Succession Planting Mache
Sow every 4.6 weeks. Last sowing by Aug 28 to harvest before frost.
For a dedicated fall crop, sow by Aug 18.
Plant Water Budget
Monthly Watering Guide for Mache
Mache needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.
| Month | Mache Needs | Rainfall | You Supplement | Action |
|---|---|---|---|---|
| Jan | โ | 5.4" | 0" | โ๏ธ Dormant |
| Feb | โ | 4.6" | 0" | โ๏ธ Dormant |
| Mar | โ | 4" | 0" | โ๏ธ Dormant |
| Apr | 4.3" | 2.6" | 1.7" | ๐ง Light watering |
| May | 4.3" | 2.5" | 1.8" | ๐ง Light watering |
| Jun | 4.3" | 1.7" | 2.6" | ๐ฟ Regular watering |
| Jul | 4.3" | 0.6" | 3.7" | ๐ฟ Regular watering |
| Aug | 4.3" | 0.8" | 3.5" | ๐ฟ Regular watering |
| Sep | 4.3" | 1.5" | 2.8" | ๐ฟ Regular watering |
| Oct | 4.3" | 3.1" | 1.2" | ๐ง Light watering |
| Nov | โ | 5.9" | 0" | โ๏ธ Dormant |
| Dec | โ | 7.2" | 0" | โ๏ธ Dormant |
Water needs are for active growing months only (AprโOct in Clark County). Supplement amounts are based on average rainfall โ actual needs vary with temperature, soil, and mulching.
Mache Heat Requirements (GDD)
What are Growing Degree Days (GDD)?
Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" โ every day above 50ยฐF deposits warmth that helps your plants grow.
Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.
Mache Planting Timeline โ Clark County, WA
Mache Planting Calendar
| Activity | When | Date Range |
|---|---|---|
| Start Indoors | March 10 | Mar 10 โ Mar 24 |
| Transplant Outdoors | April 14 | Apr 14 โ Apr 28 |
| Direct Sow | March 31 | Mar 31 โ Apr 21 |
| Harvest | May 26 | May 26 โ Jun 30 |
| Fall Sowing | August 18 | Aug 18 โ Sep 1 |
Plant 0.5" deep ยท 6" apart ยท Rows 12" apart
Month-by-Month Timeline
| Month | Activities |
|---|---|
| January | โ |
| February | โ |
| March | Start Indoors Direct Sow |
| April | Transplant Outdoors Direct Sow |
| May | Harvest |
| June | Harvest |
| July | โ |
| August | Fall Sowing |
| September | Fall Sowing |
| October | โ |
| November | โ |
| December | โ |
Growing Conditions
โ๏ธ Sun
Partial Shade (3-6 hours)
๐ง Water
1"/week ยท 1-2 times/week
๐ Days to Maturity
40โ60 days
๐งช Soil pH
Needs 6โ7.5 ยท Your soil: too_acidic
๐บ๏ธ USDA Zone
Zone 8a
๐ Growing Season
196 days in Clark County
Growing Tips for Mache in Clark County
Direct sow Mache outdoors after April 14 in Clark County when soil has warmed and frost danger has passed.
Your generous 196.0-day season in Clark County allows multiple plantings of Mache. Sow every 20.0 days for continuous harvest.
General growing tips
Direct sow in early spring or late summer for fall and winter harvest. Seeds need light to germinate so press gently into soil surface. Harvest whole rosettes.
Companion Planting
Good Companions
Check more plant combinations with our Companion Planting Checker →
Mache in Other Locations
Frequently Asked Questions
When should I plant Mache in Clark County, WA?
Clark County is in Zone 8a with an average last frost of April 14. Plan your Mache planting based on this frost date โ see the calendar above for exact timing.
What planting zone is Clark County, WA?
Clark County, Washington is in USDA Hardiness Zone 8a. The average last spring frost is April 14 and first fall frost is October 27.
Plan Your Garden with Confidence
Get our free Garden Planner โ designed to help Clark County gardeners in Zone 8a organize planting dates, track what's growing, and never miss a planting window.
Get Your Free Garden Planner →Free download. Plan your entire garden season in minutes.