When to Plant Mache in Otsego County, NY
Mache (corn salad) is a cold-hardy salad green with small, rounded, tender leaves and a mild, nutty flavor. It thrives in cool weather and even overwinters in many climates.
Otsego County, New York is in USDA Zone 5a. The average last spring frost is May 10 and the first fall frost is October 12, giving you a growing season of approximately 155 days.
At an elevation of 909 feet, Otsego County receives approximately 44.5 inches of rainfall annually with predominantly silt loam soil. Summer highs average 85ยฐF, providing good warmth for Mache during the growing season.
Otsego County Soil Profile
Soil Type
Silt Loam
Soil pH
5.2-6.2
Drainage
Well Drained
Plant Planting Risk Windows
Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.
Soil Compatibility in Otsego County
How your county's soil matches Mache's growing requirements.
Soil pH
Your soil pH (5.2โ6.2) is more acidic than Mache prefers (6.0โ7.5). Add garden lime to raise pH.
Soil Texture
The silt loam soil in Otsego County is excellent for Mache โ good drainage, moisture retention, and nutrient holding capacity.
Organic Matter
Organic matter is moderate (3.1%). Annual compost additions will help Mache.
How to Plant Mache
Fall planting: Sow 10 weeks before your first frost date for a fall harvest.
Succession Planting Mache
Sow every 4.6 weeks. Last sowing by Aug 13 to harvest before frost.
For a dedicated fall crop, sow by Aug 03.
Plant Water Budget
Monthly Watering Guide for Mache
Mache needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.
| Month | Mache Needs | Rainfall | You Supplement | Action |
|---|---|---|---|---|
| Jan | โ | 3.7" | 0" | โ๏ธ Dormant |
| Feb | โ | 2.9" | 0" | โ๏ธ Dormant |
| Mar | โ | 4" | 0" | โ๏ธ Dormant |
| Apr | โ | 3.7" | 0" | โ๏ธ Dormant |
| May | 4.3" | 3.8" | 0.5" | ๐ง Light watering |
| Jun | 4.3" | 3.9" | 0.4" | ๐ง Light watering |
| Jul | 4.3" | 4.2" | 0.1" | ๐ง Light watering |
| Aug | 4.3" | 3.9" | 0.4" | ๐ง Light watering |
| Sep | 4.3" | 3.7" | 0.6" | ๐ง Light watering |
| Oct | 4.3" | 3.5" | 0.8" | ๐ง Light watering |
| Nov | โ | 4" | 0" | โ๏ธ Dormant |
| Dec | โ | 3.2" | 0" | โ๏ธ Dormant |
Water needs are for active growing months only (MayโOct in Otsego County). Supplement amounts are based on average rainfall โ actual needs vary with temperature, soil, and mulching.
Mache Heat Requirements (GDD)
What are Growing Degree Days (GDD)?
Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" โ every day above 50ยฐF deposits warmth that helps your plants grow.
Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.
Mache Planting Timeline โ Otsego County, NY
Mache Planting Calendar
| Activity | When | Date Range |
|---|---|---|
| Start Indoors | April 5 | Apr 5 โ Apr 19 |
| Transplant Outdoors | May 10 | May 10 โ May 24 |
| Direct Sow | April 26 | Apr 26 โ May 17 |
| Harvest | June 21 | Jun 21 โ Jul 26 |
| Fall Sowing | August 3 | Aug 3 โ Aug 17 |
Plant 0.5" deep ยท 6" apart ยท Rows 12" apart
Month-by-Month Timeline
| Month | Activities |
|---|---|
| January | โ |
| February | โ |
| March | โ |
| April | Start Indoors Direct Sow |
| May | Transplant Outdoors Direct Sow |
| June | Harvest |
| July | Harvest |
| August | Fall Sowing |
| September | โ |
| October | โ |
| November | โ |
| December | โ |
Growing Conditions
โ๏ธ Sun
Partial Shade (3-6 hours)
๐ง Water
1"/week ยท Natural rainfall sufficient
๐ Days to Maturity
40โ60 days
๐งช Soil pH
Needs 6โ7.5 ยท Your soil: too_acidic
๐บ๏ธ USDA Zone
Zone 5a
๐ Growing Season
155 days in Otsego County
Growing Tips for Mache in Otsego County
Direct sow Mache outdoors after May 10 in Otsego County when soil has warmed and frost danger has passed.
Your generous 155.0-day season in Otsego County allows multiple plantings of Mache. Sow every 20.0 days for continuous harvest.
General growing tips
Direct sow in early spring or late summer for fall and winter harvest. Seeds need light to germinate so press gently into soil surface. Harvest whole rosettes.
Companion Planting
Good Companions
Check more plant combinations with our Companion Planting Checker →
Mache in Other Locations
Frequently Asked Questions
When should I plant Mache in Otsego County, NY?
Otsego County is in Zone 5a with an average last frost of May 10. Plan your Mache planting based on this frost date โ see the calendar above for exact timing.
What planting zone is Otsego County, NY?
Otsego County, New York is in USDA Hardiness Zone 5a. The average last spring frost is May 10 and first fall frost is October 12.
Plan Your Garden with Confidence
Get our free Garden Planner โ designed to help Otsego County gardeners in Zone 5a organize planting dates, track what's growing, and never miss a planting window.
Get Your Free Garden Planner →Free download. Plan your entire garden season in minutes.