When to Plant Mache in Musselshell County, MT
Mache (corn salad) is a cold-hardy salad green with small, rounded, tender leaves and a mild, nutty flavor. It thrives in cool weather and even overwinters in many climates.
Musselshell County, Montana is in USDA Zone 4a. The average last spring frost is May 14 and the first fall frost is September 23, giving you a growing season of approximately 132 days.
At an elevation of 6,528 feet, Musselshell County receives approximately 15.4 inches of rainfall annually with predominantly loam soil. Summer highs average 82ยฐF, so choose short-season varieties of Mache to ensure they mature before fall. With low rainfall, drip irrigation is essential for growing Mache successfully. Mulch heavily to conserve soil moisture.
Musselshell County Soil Profile
Soil Type
Loam
Soil pH
6.5-8.4
Drainage
Well Drained
Plant Planting Risk Windows
Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.
Soil Compatibility in Musselshell County
How your county's soil matches Mache's growing requirements.
Soil pH
Your soil pH (6.5โ8.4) overlaps with Mache's range (6.0โ7.5), though not a perfect match.
Soil Texture
The loam soil in Musselshell County is excellent for Mache โ good drainage, moisture retention, and nutrient holding capacity.
Organic Matter
Organic matter is moderate (2.7%). Annual compost additions will help Mache.
How to Plant Mache
Fall planting: Sow 12 weeks before your first frost date for a fall harvest.
Succession Planting Mache
Sow every 4.6 weeks. Last sowing by Jul 25 to harvest before frost.
For a dedicated fall crop, sow by Jul 01.
Plant Water Budget
Water stress score is 8/10 โ consider drought-tolerant varieties and mulching
Monthly Watering Guide for Mache
Mache needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.
| Month | Mache Needs | Rainfall | You Supplement | Action |
|---|---|---|---|---|
| Jan | โ | 1.1" | 0" | โ๏ธ Dormant |
| Feb | โ | 0.8" | 0" | โ๏ธ Dormant |
| Mar | โ | 1.2" | 0" | โ๏ธ Dormant |
| Apr | โ | 1.7" | 0" | โ๏ธ Dormant |
| May | 4.3" | 2" | 2.3" | ๐ฟ Regular watering |
| Jun | 4.3" | 1.1" | 3.2" | ๐ฟ Regular watering |
| Jul | 4.3" | 1.3" | 3" | ๐ฟ Regular watering |
| Aug | 4.3" | 1.6" | 2.7" | ๐ฟ Regular watering |
| Sep | 4.3" | 1.1" | 3.2" | ๐ฟ Regular watering |
| Oct | โ | 1.4" | 0" | โ๏ธ Dormant |
| Nov | โ | 1.1" | 0" | โ๏ธ Dormant |
| Dec | โ | 1" | 0" | โ๏ธ Dormant |
Water needs are for active growing months only (MayโSep in Musselshell County). Supplement amounts are based on average rainfall โ actual needs vary with temperature, soil, and mulching.
Mache Heat Requirements (GDD)
What are Growing Degree Days (GDD)?
Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" โ every day above 50ยฐF deposits warmth that helps your plants grow.
Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.
Mache Planting Timeline โ Musselshell County, MT
Mache Planting Calendar
| Activity | When | Date Range |
|---|---|---|
| Start Indoors | April 2 | Apr 2 โ Apr 16 |
| Transplant Outdoors | May 14 | May 14 โ May 28 |
| Direct Sow | May 7 | May 7 โ May 28 |
| Harvest | June 25 | Jun 25 โ Jul 30 |
| Fall Sowing | July 1 | Jul 1 โ Jul 15 |
Plant 0.5" deep ยท 6" apart ยท Rows 12" apart
Month-by-Month Timeline
| Month | Activities |
|---|---|
| January | โ |
| February | โ |
| March | โ |
| April | Start Indoors |
| May | Transplant Outdoors Direct Sow |
| June | Harvest |
| July | Fall Sowing Harvest |
| August | โ |
| September | โ |
| October | โ |
| November | โ |
| December | โ |
Growing Conditions
โ๏ธ Sun
Partial Shade (3-6 hours)
๐ง Water
1"/week ยท 1-2 times/week
๐ Days to Maturity
40โ60 days
๐งช Soil pH
Needs 6โ7.5 ยท Your soil: acceptable
๐บ๏ธ USDA Zone
Zone 4a
๐ Growing Season
132 days in Musselshell County
Growing Tips for Mache in Musselshell County
Direct sow Mache outdoors after May 14 in Musselshell County when soil has warmed and frost danger has passed.
Musselshell County receives only 15" of rain annually. Mache needs consistent moisture โ install drip irrigation or water deeply 2-3 times per week.
General growing tips
Direct sow in early spring or late summer for fall and winter harvest. Seeds need light to germinate so press gently into soil surface. Harvest whole rosettes.
Companion Planting
Good Companions
Check more plant combinations with our Companion Planting Checker →
Mache in Other Locations
Frequently Asked Questions
When should I plant Mache in Musselshell County, MT?
Musselshell County is in Zone 4a with an average last frost of May 14. Plan your Mache planting based on this frost date โ see the calendar above for exact timing.
What planting zone is Musselshell County, MT?
Musselshell County, Montana is in USDA Hardiness Zone 4a. The average last spring frost is May 14 and first fall frost is September 23.
Plan Your Garden with Confidence
Get our free Garden Planner โ designed to help Musselshell County gardeners in Zone 4a organize planting dates, track what's growing, and never miss a planting window.
Get Your Free Garden Planner →Free download. Plan your entire garden season in minutes.