When to Plant Mache in Greeley County, KS
Mache (corn salad) is a cold-hardy salad green with small, rounded, tender leaves and a mild, nutty flavor. It thrives in cool weather and even overwinters in many climates.
Greeley County, Kansas is in USDA Zone 5b. The average last spring frost is April 30 and the first fall frost is October 10, giving you a growing season of approximately 163 days.
At an elevation of 963 feet, Greeley County receives approximately 21.1 inches of rainfall annually with predominantly loam soil. Summer highs average 87ยฐF, providing good warmth for Mache during the growing season.
Greeley County Soil Profile
Soil Type
Loam
Soil pH
6.2-7.2
Drainage
Well Drained
Plant Planting Risk Windows
Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.
Soil Compatibility in Greeley County
How your county's soil matches Mache's growing requirements.
Soil pH
Your soil pH (6.2โ7.2) is within Mache's preferred range (6.0โ7.5).
Soil Texture
The loam soil in Greeley County is excellent for Mache โ good drainage, moisture retention, and nutrient holding capacity.
Drainage
Drainage is adequate for Mache.
Organic Matter
Organic matter is moderate (3.4%). Annual compost additions will help Mache.
How to Plant Mache
Fall planting: Sow 10 weeks before your first frost date for a fall harvest.
Succession Planting Mache
Sow every 4.6 weeks. Last sowing by Aug 11 to harvest before frost.
For a dedicated fall crop, sow by Aug 01.
Plant Water Budget
Water stress score is 8/10 โ consider drought-tolerant varieties and mulching
Monthly Watering Guide for Mache
Mache needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.
| Month | Mache Needs | Rainfall | You Supplement | Action |
|---|---|---|---|---|
| Jan | โ | 1.4" | 0" | โ๏ธ Dormant |
| Feb | โ | 1.4" | 0" | โ๏ธ Dormant |
| Mar | โ | 2.1" | 0" | โ๏ธ Dormant |
| Apr | 4.3" | 2" | 2.3" | ๐ฟ Regular watering |
| May | 4.3" | 2.7" | 1.6" | ๐ง Light watering |
| Jun | 4.3" | 1.4" | 2.9" | ๐ฟ Regular watering |
| Jul | 4.3" | 1.6" | 2.7" | ๐ฟ Regular watering |
| Aug | 4.3" | 2" | 2.3" | ๐ฟ Regular watering |
| Sep | 4.3" | 2" | 2.3" | ๐ฟ Regular watering |
| Oct | 4.3" | 1.7" | 2.6" | ๐ฟ Regular watering |
| Nov | โ | 1.7" | 0" | โ๏ธ Dormant |
| Dec | โ | 1.1" | 0" | โ๏ธ Dormant |
Water needs are for active growing months only (AprโOct in Greeley County). Supplement amounts are based on average rainfall โ actual needs vary with temperature, soil, and mulching.
Mache Heat Requirements (GDD)
What are Growing Degree Days (GDD)?
Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" โ every day above 50ยฐF deposits warmth that helps your plants grow.
Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.
Mache Planting Timeline โ Greeley County, KS
Mache Planting Calendar
| Activity | When | Date Range |
|---|---|---|
| Start Indoors | March 26 | Mar 26 โ Apr 9 |
| Transplant Outdoors | April 30 | Apr 30 โ May 14 |
| Direct Sow | April 16 | Apr 16 โ May 7 |
| Harvest | June 11 | Jun 11 โ Jul 16 |
| Fall Sowing | August 1 | Aug 1 โ Aug 15 |
Plant 0.5" deep ยท 6" apart ยท Rows 12" apart
Month-by-Month Timeline
| Month | Activities |
|---|---|
| January | โ |
| February | โ |
| March | Start Indoors |
| April | Start Indoors Transplant Outdoors Direct Sow |
| May | Transplant Outdoors Direct Sow |
| June | Harvest |
| July | Harvest |
| August | Fall Sowing |
| September | โ |
| October | โ |
| November | โ |
| December | โ |
Growing Conditions
โ๏ธ Sun
Partial Shade (3-6 hours)
๐ง Water
1"/week ยท 2-3 times/week
๐ Days to Maturity
40โ60 days
๐งช Soil pH
Needs 6โ7.5 ยท Your soil: ideal
๐บ๏ธ USDA Zone
Zone 5b
๐ Growing Season
163 days in Greeley County
Growing Tips for Mache in Greeley County
Direct sow Mache outdoors after April 30 in Greeley County when soil has warmed and frost danger has passed.
Your generous 163.0-day season in Greeley County allows multiple plantings of Mache. Sow every 20.0 days for continuous harvest.
Greeley County receives only 21" of rain annually. Mache needs consistent moisture โ install drip irrigation or water deeply 2-3 times per week.
General growing tips
Direct sow in early spring or late summer for fall and winter harvest. Seeds need light to germinate so press gently into soil surface. Harvest whole rosettes.
Companion Planting
Good Companions
Check more plant combinations with our Companion Planting Checker →
Mache in Other Locations
Frequently Asked Questions
When should I plant Mache in Greeley County, KS?
Greeley County is in Zone 5b with an average last frost of April 30. Plan your Mache planting based on this frost date โ see the calendar above for exact timing.
What planting zone is Greeley County, KS?
Greeley County, Kansas is in USDA Hardiness Zone 5b. The average last spring frost is April 30 and first fall frost is October 10.
Plan Your Garden with Confidence
Get our free Garden Planner โ designed to help Greeley County gardeners in Zone 5b organize planting dates, track what's growing, and never miss a planting window.
Get Your Free Garden Planner →Free download. Plan your entire garden season in minutes.