When to Plant Mache in Jefferson County, ID
Mache (corn salad) is a cold-hardy salad green with small, rounded, tender leaves and a mild, nutty flavor. It thrives in cool weather and even overwinters in many climates.
Jefferson County, Idaho is in USDA Zone 5a. The average last spring frost is May 22 and the first fall frost is September 21, giving you a growing season of approximately 122 days.
At an elevation of 5,094 feet, Jefferson County receives approximately 18 inches of rainfall annually with predominantly loam soil. Summer highs average 87ยฐF, providing good warmth for Mache during the growing season. With low rainfall, drip irrigation is essential for growing Mache successfully. Mulch heavily to conserve soil moisture.
Jefferson County Soil Profile
Soil Type
Loam
Soil pH
6.3-7.8
Drainage
Well Drained
Plant Planting Risk Windows
Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.
Soil Compatibility in Jefferson County
How your county's soil matches Mache's growing requirements.
Soil pH
Your soil pH (6.3โ7.8) overlaps with Mache's range (6.0โ7.5), though not a perfect match.
Soil Texture
The loam soil in Jefferson County is excellent for Mache โ good drainage, moisture retention, and nutrient holding capacity.
Organic Matter
Organic matter is moderate (2.4%). Annual compost additions will help Mache.
How to Plant Mache
Fall planting: Sow 10 weeks before your first frost date for a fall harvest.
Succession Planting Mache
Sow every 4.6 weeks. Last sowing by Jul 23 to harvest before frost.
For a dedicated fall crop, sow by Jul 13.
Plant Water Budget
Water stress score is 6/10 โ consider drought-tolerant varieties and mulching
Monthly Watering Guide for Mache
Mache needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.
| Month | Mache Needs | Rainfall | You Supplement | Action |
|---|---|---|---|---|
| Jan | โ | 1.1" | 0" | โ๏ธ Dormant |
| Feb | โ | 1.2" | 0" | โ๏ธ Dormant |
| Mar | โ | 1.4" | 0" | โ๏ธ Dormant |
| Apr | โ | 2" | 0" | โ๏ธ Dormant |
| May | 4.3" | 1.9" | 2.4" | ๐ฟ Regular watering |
| Jun | 4.3" | 1.4" | 2.9" | ๐ฟ Regular watering |
| Jul | 4.3" | 1.4" | 2.9" | ๐ฟ Regular watering |
| Aug | 4.3" | 2" | 2.3" | ๐ฟ Regular watering |
| Sep | 4.3" | 1.6" | 2.7" | ๐ฟ Regular watering |
| Oct | โ | 1.6" | 0" | โ๏ธ Dormant |
| Nov | โ | 1.3" | 0" | โ๏ธ Dormant |
| Dec | โ | 1" | 0" | โ๏ธ Dormant |
Water needs are for active growing months only (MayโSep in Jefferson County). Supplement amounts are based on average rainfall โ actual needs vary with temperature, soil, and mulching.
Mache Heat Requirements (GDD)
What are Growing Degree Days (GDD)?
Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" โ every day above 50ยฐF deposits warmth that helps your plants grow.
Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.
Mache Planting Timeline โ Jefferson County, ID
Mache Planting Calendar
| Activity | When | Date Range |
|---|---|---|
| Start Indoors | April 17 | Apr 17 โ May 1 |
| Transplant Outdoors | May 22 | May 22 โ Jun 5 |
| Direct Sow | May 8 | May 8 โ May 29 |
| Harvest | July 3 | Jul 3 โ Aug 7 |
| Fall Sowing | July 13 | Jul 13 โ Jul 27 |
Plant 0.5" deep ยท 6" apart ยท Rows 12" apart
Month-by-Month Timeline
| Month | Activities |
|---|---|
| January | โ |
| February | โ |
| March | โ |
| April | Start Indoors |
| May | Start Indoors Transplant Outdoors Direct Sow |
| June | Transplant Outdoors |
| July | Fall Sowing Harvest |
| August | Harvest |
| September | โ |
| October | โ |
| November | โ |
| December | โ |
Growing Conditions
โ๏ธ Sun
Partial Shade (3-6 hours)
๐ง Water
1"/week ยท 1-2 times/week
๐ Days to Maturity
40โ60 days
๐งช Soil pH
Needs 6โ7.5 ยท Your soil: acceptable
๐บ๏ธ USDA Zone
Zone 5a
๐ Growing Season
122 days in Jefferson County
Growing Tips for Mache in Jefferson County
Direct sow Mache outdoors after May 22 in Jefferson County when soil has warmed and frost danger has passed.
Jefferson County receives only 18" of rain annually. Mache needs consistent moisture โ install drip irrigation or water deeply 2-3 times per week.
General growing tips
Direct sow in early spring or late summer for fall and winter harvest. Seeds need light to germinate so press gently into soil surface. Harvest whole rosettes.
Companion Planting
Good Companions
Check more plant combinations with our Companion Planting Checker →
Mache in Other Locations
Frequently Asked Questions
When should I plant Mache in Jefferson County, ID?
Jefferson County is in Zone 5a with an average last frost of May 22. Plan your Mache planting based on this frost date โ see the calendar above for exact timing.
What planting zone is Jefferson County, ID?
Jefferson County, Idaho is in USDA Hardiness Zone 5a. The average last spring frost is May 22 and first fall frost is September 21.
Plan Your Garden with Confidence
Get our free Garden Planner โ designed to help Jefferson County gardeners in Zone 5a organize planting dates, track what's growing, and never miss a planting window.
Get Your Free Garden Planner →Free download. Plan your entire garden season in minutes.