When to Plant Komatsuna in Miller County, AR
Komatsuna (Japanese mustard spinach) is a versatile Asian green with glossy, dark leaves and a mild, sweet flavor. It is extremely cold-hardy and heat-tolerant.
Miller County, Arkansas is in USDA Zone 8a. The average last spring frost is March 21 and the first fall frost is November 12, giving you a growing season of approximately 236 days.
At an elevation of 266 feet, Miller County receives approximately 50.4 inches of rainfall annually with predominantly silt loam soil. Summer highs average 93ยฐF, providing good warmth for Komatsuna during the growing season. Ample rainfall means less supplemental watering, but ensure good drainage to prevent Komatsuna root diseases.
Miller County Soil Profile
Soil Type
Silt Loam
Soil pH
5.3-7.1
Drainage
Well Drained
Plant Planting Risk Windows
Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.
Soil Compatibility in Miller County
How your county's soil matches Komatsuna's growing requirements.
Soil pH
Your soil pH (5.3โ7.1) overlaps with Komatsuna's range (6.0โ7.5), though not a perfect match.
Soil Texture
The silt loam soil in Miller County is excellent for Komatsuna โ good drainage, moisture retention, and nutrient holding capacity.
Organic Matter
Organic matter is moderate (3.2%). Annual compost additions will help Komatsuna.
How to Plant Komatsuna
Fall planting: Sow 10 weeks before your first frost date for a fall harvest.
Succession Planting Komatsuna
Sow every 4 weeks. Last sowing by Sep 23 to harvest before frost.
For a dedicated fall crop, sow by Sep 03.
Plant Water Budget
Water stress score is 6/10 โ consider drought-tolerant varieties and mulching
Monthly Watering Guide for Komatsuna
Komatsuna needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.
| Month | Komatsuna Needs | Rainfall | You Supplement | Action |
|---|---|---|---|---|
| Jan | โ | 3.7" | 0" | โ๏ธ Dormant |
| Feb | โ | 3.3" | 0" | โ๏ธ Dormant |
| Mar | 4.3" | 5" | 0" | โ Rainfall sufficient |
| Apr | 4.3" | 3.9" | 0.4" | ๐ง Light watering |
| May | 4.3" | 4" | 0.3" | ๐ง Light watering |
| Jun | 4.3" | 4.6" | 0" | โ Rainfall sufficient |
| Jul | 4.3" | 5.7" | 0" | โ Rainfall sufficient |
| Aug | 4.3" | 5.1" | 0" | โ Rainfall sufficient |
| Sep | 4.3" | 4.1" | 0.2" | ๐ง Light watering |
| Oct | 4.3" | 3.4" | 0.9" | ๐ง Light watering |
| Nov | 4.3" | 4.1" | 0.2" | ๐ง Light watering |
| Dec | โ | 3.5" | 0" | โ๏ธ Dormant |
Water needs are for active growing months only (MarโNov in Miller County). Supplement amounts are based on average rainfall โ actual needs vary with temperature, soil, and mulching.
Komatsuna Heat Requirements (GDD)
What are Growing Degree Days (GDD)?
Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" โ every day above 50ยฐF deposits warmth that helps your plants grow.
Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.
Komatsuna Planting Timeline โ Miller County, AR
Komatsuna Planting Calendar
| Activity | When | Date Range |
|---|---|---|
| Start Indoors | February 14 | Feb 14 โ Feb 28 |
| Transplant Outdoors | March 21 | Mar 21 โ Apr 4 |
| Direct Sow | March 7 | Mar 7 โ Mar 28 |
| Harvest | April 25 | Apr 25 โ May 30 |
| Fall Sowing | September 3 | Sep 3 โ Sep 17 |
Plant 0.5" deep ยท 6" apart ยท Rows 12" apart
Month-by-Month Timeline
| Month | Activities |
|---|---|
| January | โ |
| February | Start Indoors |
| March | Transplant Outdoors Direct Sow |
| April | Transplant Outdoors Harvest |
| May | Harvest |
| June | โ |
| July | โ |
| August | โ |
| September | Fall Sowing |
| October | โ |
| November | โ |
| December | โ |
Growing Conditions
โ๏ธ Sun
Partial Shade (3-6 hours)
๐ง Water
1"/week ยท Only during dry spells
๐ Days to Maturity
35โ50 days
๐งช Soil pH
Needs 6โ7.5 ยท Your soil: acceptable
๐บ๏ธ USDA Zone
Zone 8a
๐ Growing Season
236 days in Miller County
Growing Tips for Komatsuna in Miller County
Direct sow Komatsuna outdoors after March 21 in Miller County when soil has warmed and frost danger has passed.
Your generous 236.0-day season in Miller County allows multiple plantings of Komatsuna. Sow every 17.0 days for continuous harvest.
Common pests for Komatsuna in this region include cabbage worm and flea beetles. Use row covers early in the season and inspect plants weekly.
General growing tips
Direct sow in spring or fall. One of the most forgiving Asian greens for all seasons. Harvest outer leaves or cut whole plants. Excellent for stir-fries, soups, or salads.
Companion Planting
Good Companions
Avoid Planting Near
Check more plant combinations with our Companion Planting Checker →
Komatsuna in Other Locations
Frequently Asked Questions
When should I plant Komatsuna in Miller County, AR?
Miller County is in Zone 8a with an average last frost of March 21. Plan your Komatsuna planting based on this frost date โ see the calendar above for exact timing.
What planting zone is Miller County, AR?
Miller County, Arkansas is in USDA Hardiness Zone 8a. The average last spring frost is March 21 and first fall frost is November 12.
Plan Your Garden with Confidence
Get our free Garden Planner โ designed to help Miller County gardeners in Zone 8a organize planting dates, track what's growing, and never miss a planting window.
Get Your Free Garden Planner →Free download. Plan your entire garden season in minutes.