Blog

When to Plant Jostaberry in Chittenden County, VT

Jostaberry is a thornless hybrid of black currant and gooseberry, producing medium-sized, dark berries with a complex, tart-sweet flavor. It is vigorous and disease-resistant.

Chittenden County, Vermont is in USDA Zone 4b. The average last spring frost is May 12 and the first fall frost is October 5, giving you a growing season of approximately 146 days.

At an elevation of 235 feet, Chittenden County receives approximately 38.6 inches of rainfall annually with predominantly silt loam soil. Summer highs average 82ยฐF, so choose short-season varieties of Jostaberry to ensure they mature before fall.

Chittenden County, VT (Zone 4b) Short season
146 days
Last Spring Frost May 12
146 growing days
First Fall Frost October 5

Chittenden County Soil Profile

Soil Type

Silt Loam

Soil pH

4.8-6.3

Drainage

Well Drained

Plant Planting Risk Windows

Early Start (70% safe) ✓ Fits season
Transplant: Jun 3
Recommended (50%) ✓ Fits season
Transplant: Jun 9
Safe Start (90%) ✓ Fits season
Transplant: Jun 29

Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.

Soil Compatibility in Chittenden County

How your county's soil matches Jostaberry's growing requirements.

Soil pH

Your soil pH (4.8โ€“6.3) is more acidic than Jostaberry prefers (6.0โ€“6.5). Add garden lime to raise pH.

Soil Texture

The silt loam soil in Chittenden County is excellent for Jostaberry โ€” good drainage, moisture retention, and nutrient holding capacity.

Organic Matter

Organic matter is moderate (3.2%). Annual compost additions will help Jostaberry.

How to Plant Jostaberry

48"
Between Plants
72"
Between Rows

Plant Water Budget

Plant needs
1.0″/week
Rainfall provides
1.1″/week
Watering frequency Natural rainfall sufficient
Season total 0 gal / 100 sq ft

Monthly Watering Guide for Jostaberry

Jostaberry needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.

Month Jostaberry Needs Rainfall You Supplement Action
Jan โ€” 2.5" 0" โ„๏ธ Dormant
Feb โ€” 2.4" 0" โ„๏ธ Dormant
Mar โ€” 3.5" 0" โ„๏ธ Dormant
Apr โ€” 3" 0" โ„๏ธ Dormant
May 4.3" 3.1" 1.2" ๐Ÿ’ง Light watering
Jun 4.3" 3.8" 0.5" ๐Ÿ’ง Light watering
Jul 4.3" 4.1" 0.2" ๐Ÿ’ง Light watering
Aug 4.3" 4" 0.3" ๐Ÿ’ง Light watering
Sep 4.3" 3.5" 0.8" ๐Ÿ’ง Light watering
Oct 4.3" 3.6" 0.7" ๐Ÿ’ง Light watering
Nov โ€” 2.7" 0" โ„๏ธ Dormant
Dec โ€” 2.5" 0" โ„๏ธ Dormant

Water needs are for active growing months only (Mayโ€“Oct in Chittenden County). Supplement amounts are based on average rainfall โ€” actual needs vary with temperature, soil, and mulching.

Jostaberry Heat Requirements (GDD)

What are Growing Degree Days (GDD)?

Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" โ€” every day above 50ยฐF deposits warmth that helps your plants grow.

Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.

Jostaberry needs ~10,494 GDD — county provides 1,679 GDD May not mature

Jostaberry Planting Timeline โ€” Chittenden County, VT

Jostaberry Planting Calendar

Activity When Date Range
Transplant Outdoors June 9 Jun 9 โ€“ Jun 23

ยท 48" apart ยท Rows 72" apart

Month-by-Month Timeline

MonthActivities
January โ€”
February โ€”
March โ€”
April โ€”
May โ€”
June Transplant Outdoors
July โ€”
August โ€”
September โ€”
October โ€”
November โ€”
December โ€”

Growing Conditions

โ˜€๏ธ Sun

Partial Shade (3-6 hours)

๐Ÿ’ง Water

1"/week ยท Natural rainfall sufficient

๐Ÿ“… Days to Maturity

730โ€“1095 days

๐Ÿงช Soil pH

Needs 6โ€“6.5 ยท Your soil: too_acidic

๐Ÿ—บ๏ธ USDA Zone

Zone 4b

๐Ÿ“† Growing Season

146 days in Chittenden County

Growing Tips for Jostaberry in Chittenden County

Direct sow Jostaberry outdoors after May 12 in Chittenden County when soil has warmed and frost danger has passed.

Your 146.0-day growing season in Chittenden County is tight for Jostaberry (730.0-1095.0 days to maturity). Start indoors and choose early-maturing varieties.

General growing tips

Plant in rich, well-drained soil. No special pruning required beyond removing old wood. Self-fertile but yields improve with a second bush. Berries ripen midsummer.

Companion Planting

Good Companions

Check more plant combinations with our Companion Planting Checker →

Frequently Asked Questions

When should I plant Jostaberry in Chittenden County, VT?

Chittenden County is in Zone 4b with an average last frost of May 12. Plan your Jostaberry planting based on this frost date โ€” see the calendar above for exact timing.

What planting zone is Chittenden County, VT?

Chittenden County, Vermont is in USDA Hardiness Zone 4b. The average last spring frost is May 12 and first fall frost is October 5.

๐ŸŒฑ

Plan Your Garden with Confidence

Get our free Garden Planner โ€” designed to help Chittenden County gardeners in Zone 4b organize planting dates, track what's growing, and never miss a planting window.

Get Your Free Garden Planner →

Free download. Plan your entire garden season in minutes.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Chittenden County, VT. Local conditions may vary. Last updated: April 2026.