Blog

When to Plant Ground Cherry in Scott County, MO

Ground cherries produce small, sweet, tropical-tasting berries enclosed in papery husks. They are related to tomatillos and cape gooseberries and self-sow readily.

Scott County, Missouri is in USDA Zone 6b. The average last spring frost is April 9 and the first fall frost is October 24, giving you a growing season of approximately 198 days.

At an elevation of 880 feet, Scott County receives approximately 34.9 inches of rainfall annually with predominantly silt loam soil. Summer highs average 85ยฐF, providing good warmth for Ground Cherry during the growing season.

Scott County, MO (Zone 6b) Moderate season
198 days
Last Spring Frost April 9
198 growing days
First Fall Frost October 24

Scott County Soil Profile

Soil Type

Silt Loam

Soil pH

5.5-6.7

Drainage

Well Drained

Plant Planting Risk Windows

Early Start (70% safe) ✓ Fits season (49 days to spare)
Transplant: Apr 25 🍅 Harvest: Jul 4 – Aug 29
Recommended (50%) ✓ Fits season (51 days to spare)
Transplant: Apr 30 🍅 Harvest: Jul 9 – Sep 3
Safe Start (90%) ✓ Fits season (49 days to spare)
Transplant: May 14 🍅 Harvest: Jul 23 – Sep 17

Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.

Plant Water Budget

Plant needs
1.0″/week
Rainfall provides
0.7″/week
Watering frequency Natural rainfall sufficient
Season total 0 gal / 100 sq ft
Ground Cherry needs ~997 GDD — county provides 2,722 GDD Excellent fit

Ground Cherry Planting Timeline โ€” Scott County, MO

Ground Cherry Planting Calendar

Activity When Date Range
Transplant Outdoors April 30 Apr 30 โ€“ May 14
Harvest July 9 Jul 9 โ€“ Sep 3

Plant 1" deep ยท 15" apart ยท Rows 24" apart

Month-by-Month Timeline

MonthActivities
January โ€”
February โ€”
March โ€”
April Transplant Outdoors
May Transplant Outdoors
June โ€”
July Harvest
August Harvest
September Harvest
October โ€”
November โ€”
December โ€”

Growing Conditions

Sun

Full Sun (6-8+ hours)

Water

Moderate โ€” regular watering

Days to Maturity

65โ€“80 days

Soil pH

6 โ€“ 7.5

USDA Zone

Zone 6b

Growing Season

198 days

Growing Tips for Scott County

Start seeds indoors 6-8 weeks before last frost. Let fruits fall to the ground naturally when ripe inside their husks. The husk turns brown and papery when the fruit is ready.

Companion Planting

Good Companions

Avoid Planting Near

  • Fennel

Level Up Your Garden

Frequently Asked Questions

When should I plant Ground Cherry in Scott County, MO?

Scott County is in Zone 6b with an average last frost of April 9. Plan your Ground Cherry planting based on this frost date โ€” see the calendar above for exact timing.

What planting zone is Scott County, MO?

Scott County, Missouri is in USDA Hardiness Zone 6b. The average last spring frost is April 9 and first fall frost is October 24.

๐ŸŒฑ

Plan Your Garden with Confidence

Get our free Garden Planner โ€” designed to help Scott County gardeners in Zone 6b organize planting dates, track what's growing, and never miss a planting window.

Get Your Free Garden Planner →

Free download. Plan your entire garden season in minutes.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Scott County, MO. Local conditions may vary. Last updated: April 2026.