When to Plant Ground Cherry in Clay County, MO

Ground cherries produce small, sweet, tropical-tasting berries enclosed in papery husks. They are related to tomatillos and cape gooseberries and self-sow readily.

Clay County, Missouri is in USDA Zone 6a. The average last spring frost is April 13 and the first fall frost is October 24, giving you a growing season of approximately 194 days.

At an elevation of 1,373 feet, Clay County receives approximately 33.8 inches of rainfall annually with predominantly silt loam soil. Summer highs average 88ยฐF, providing good warmth for Ground Cherry during the growing season.

Clay County, MO (Zone 6a) Moderate season
194 days
Last Spring Frost April 13
194 growing days
First Fall Frost October 24

Clay County Soil Profile

Soil Type

Silt Loam

Soil pH

5.3-6.8

Drainage

Well Drained

Plant Planting Risk Windows

Early Start (70% safe) ✓ Fits season (45 days to spare)
Transplant: Apr 27 🍅 Harvest: Jul 6 – Aug 31
Recommended (50%) ✓ Fits season (47 days to spare)
Transplant: May 4 🍅 Harvest: Jul 13 – Sep 7
Safe Start (90%) ✓ Fits season (44 days to spare)
Transplant: May 19 🍅 Harvest: Jul 28 – Sep 22

Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.

Plant Water Budget

Plant needs
1.0″/week
Rainfall provides
0.7″/week
You supply
0.3″/week
Watering frequency Only during dry spells
Season total 463 gal / 100 sq ft
Ground Cherry needs ~1,160 GDD — county provides 3,104 GDD Excellent fit

Ground Cherry Planting Timeline โ€” Clay County, MO

Ground Cherry Planting Calendar

Activity When Date Range
Transplant Outdoors May 4 May 4 โ€“ May 18
Harvest July 13 Jul 13 โ€“ Sep 7

Plant 1" deep ยท 15" apart ยท Rows 24" apart

Month-by-Month Timeline

MonthActivities
January โ€”
February โ€”
March โ€”
April โ€”
May Transplant Outdoors
June โ€”
July Harvest
August Harvest
September Harvest
October โ€”
November โ€”
December โ€”

Growing Conditions

Sun

Full Sun (6-8+ hours)

Water

Moderate โ€” regular watering

Days to Maturity

65โ€“80 days

Soil pH

6 โ€“ 7.5

USDA Zone

Zone 6a

Growing Season

194 days

Growing Tips for Clay County

Start seeds indoors 6-8 weeks before last frost. Let fruits fall to the ground naturally when ripe inside their husks. The husk turns brown and papery when the fruit is ready.

Companion Planting

Good Companions

Avoid Planting Near

  • Fennel

Level Up Your Garden

Frequently Asked Questions

When should I plant Ground Cherry in Clay County, MO?

Clay County is in Zone 6a with an average last frost of April 13. Plan your Ground Cherry planting based on this frost date โ€” see the calendar above for exact timing.

What planting zone is Clay County, MO?

Clay County, Missouri is in USDA Hardiness Zone 6a. The average last spring frost is April 13 and first fall frost is October 24.

๐ŸŒฑ

Plan Your Garden with Confidence

Get our free Garden Planner โ€” designed to help Clay County gardeners in Zone 6a organize planting dates, track what's growing, and never miss a planting window.

Get Your Free Garden Planner →

Free download. Plan your entire garden season in minutes.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Clay County, MO. Local conditions may vary. Last updated: April 2026.