Blog

When to Plant Ground Cherry in Butler County, MO

Ground cherries produce small, sweet, tropical-tasting berries enclosed in papery husks. They are related to tomatillos and cape gooseberries and self-sow readily.

Butler County, Missouri is in USDA Zone 6b. The average last spring frost is March 27 and the first fall frost is November 2, giving you a growing season of approximately 220 days.

At an elevation of 703 feet, Butler County receives approximately 36.9 inches of rainfall annually with predominantly silt loam soil. Summer highs average 91ยฐF, providing good warmth for Ground Cherry during the growing season.

Butler County, MO (Zone 6b) Long season
220 days
Last Spring Frost March 27
220 growing days
First Fall Frost November 2

Butler County Soil Profile

Soil Type

Silt Loam

Soil pH

5.5-6.6

Drainage

Well Drained

Plant Planting Risk Windows

Early Start (70% safe) ✓ Fits season (76 days to spare)
Transplant: Apr 9 🍅 Harvest: Jun 18 – Aug 13
Recommended (50%) ✓ Fits season (73 days to spare)
Transplant: Apr 17 🍅 Harvest: Jun 26 – Aug 21
Safe Start (90%) ✓ Fits season (73 days to spare)
Transplant: May 8 🍅 Harvest: Jul 17 – Sep 11

Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.

Plant Water Budget

Plant needs
1.0″/week
Rainfall provides
0.7″/week
You supply
0.3″/week
Watering frequency Only during dry spells
Season total 579 gal / 100 sq ft
Ground Cherry needs ~1,323 GDD — county provides 4,015 GDD Excellent fit

Ground Cherry Planting Timeline โ€” Butler County, MO

Ground Cherry Planting Calendar

Activity When Date Range
Transplant Outdoors April 17 Apr 17 โ€“ May 1
Harvest June 26 Jun 26 โ€“ Aug 21

Plant 1" deep ยท 15" apart ยท Rows 24" apart

Month-by-Month Timeline

MonthActivities
January โ€”
February โ€”
March โ€”
April Transplant Outdoors
May Transplant Outdoors
June Harvest
July Harvest
August Harvest
September โ€”
October โ€”
November โ€”
December โ€”

Growing Conditions

Sun

Full Sun (6-8+ hours)

Water

Moderate โ€” regular watering

Days to Maturity

65โ€“80 days

Soil pH

6 โ€“ 7.5

USDA Zone

Zone 6b

Growing Season

220 days

Growing Tips for Butler County

Start seeds indoors 6-8 weeks before last frost. Let fruits fall to the ground naturally when ripe inside their husks. The husk turns brown and papery when the fruit is ready.

Companion Planting

Good Companions

Avoid Planting Near

  • Fennel

Level Up Your Garden

Frequently Asked Questions

When should I plant Ground Cherry in Butler County, MO?

Butler County is in Zone 6b with an average last frost of March 27. Plan your Ground Cherry planting based on this frost date โ€” see the calendar above for exact timing.

What planting zone is Butler County, MO?

Butler County, Missouri is in USDA Hardiness Zone 6b. The average last spring frost is March 27 and first fall frost is November 2.

๐ŸŒฑ

Plan Your Garden with Confidence

Get our free Garden Planner โ€” designed to help Butler County gardeners in Zone 6b organize planting dates, track what's growing, and never miss a planting window.

Get Your Free Garden Planner →

Free download. Plan your entire garden season in minutes.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Butler County, MO. Local conditions may vary. Last updated: April 2026.