When to Plant Daikon in Onslow County, NC
Daikon is a large, mild Japanese radish that can grow over a foot long. It is excellent for pickling, stir-fries, and as a soil-breaking cover crop.
Onslow County, North Carolina is in USDA Zone 8a. The average last spring frost is March 21 and the first fall frost is November 18, giving you a growing season of approximately 242 days.
At an elevation of 541 feet, Onslow County receives approximately 46.8 inches of rainfall annually with predominantly clay loam soil. Summer highs average 90ยฐF, providing good warmth for Daikon during the growing season. Clay soil retains moisture well for Daikon, but amend with compost to improve drainage and prevent root rot.
Onslow County Soil Profile
Soil Type
Clay Loam
Soil pH
5.5-6.2
Drainage
Well Drained
Plant Planting Risk Windows
Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.
Plant Water Budget
Daikon Planting Timeline โ Onslow County, NC
Daikon Planting Calendar
| Activity | When | Date Range |
|---|---|---|
| Direct Sow | March 7 | Mar 7 โ Mar 28 |
| Fall Sowing | September 9 | Sep 9 โ Sep 23 |
| Harvest | May 2 | May 2 โ May 30 |
Plant 0.5" deep ยท 6" apart ยท Rows 12" apart
Month-by-Month Timeline
| Month | Activities |
|---|---|
| January | โ |
| February | โ |
| March | Direct Sow |
| April | โ |
| May | Harvest |
| June | โ |
| July | โ |
| August | โ |
| September | Fall Sowing |
| October | โ |
| November | โ |
| December | โ |
Growing Conditions
Sun
Full Sun (6-8+ hours)
Water
Moderate โ regular watering
Days to Maturity
50โ70 days
Soil pH
5.8 โ 7
USDA Zone
Zone 8a
Growing Season
242 days
Growing Tips for Onslow County
Direct sow in late summer for fall harvest. Loosen soil deeply before planting. Thin seedlings to 6 inches apart. Harvest before hard freeze as exposed shoulders may crack.
Companion Planting
Good Companions
Avoid Planting Near
Level Up Your Garden
Daikon in Other Locations
Frequently Asked Questions
When should I plant Daikon in Onslow County, NC?
Onslow County is in Zone 8a with an average last frost of March 21. Plan your Daikon planting based on this frost date โ see the calendar above for exact timing.
What planting zone is Onslow County, NC?
Onslow County, North Carolina is in USDA Hardiness Zone 8a. The average last spring frost is March 21 and first fall frost is November 18.
Plan Your Garden with Confidence
Get our free Garden Planner โ designed to help Onslow County gardeners in Zone 8a organize planting dates, track what's growing, and never miss a planting window.
Get Your Free Garden Planner →Free download. Plan your entire garden season in minutes.