When to Plant Crookneck Squash in Bourbon County, KY
Yellow crookneck squash is a summer squash with a curved neck and bumpy, bright yellow skin. It has a buttery flavor and is best harvested young when 4-6 inches long.
Bourbon County, Kentucky is in USDA Zone 6b. The average last spring frost is April 16 and the first fall frost is October 26, giving you a growing season of approximately 193 days.
At an elevation of 3,419 feet, Bourbon County receives approximately 46.4 inches of rainfall annually with predominantly silt loam soil. Summer highs average 86ยฐF, providing good warmth for Crookneck Squash during the growing season.
Bourbon County Soil Profile
Soil Type
Silt Loam
Soil pH
5.8-7.1
Drainage
Well Drained
Plant Planting Risk Windows
Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.
Soil Compatibility in Bourbon County
How your county's soil matches Crookneck Squash's growing requirements.
Soil pH
Your soil pH (5.8โ7.1) overlaps with Crookneck Squash's range (6.0โ7.5), though not a perfect match.
Soil Texture
The silt loam soil in Bourbon County is excellent for Crookneck Squash โ good drainage, moisture retention, and nutrient holding capacity.
Organic Matter
Organic matter is moderate (2.5%). Annual compost additions will help Crookneck Squash.
How to Plant Crookneck Squash
Succession Planting Crookneck Squash
Sow every 5.1 weeks. Last sowing by Aug 27 to harvest before frost.
Plant Water Budget
Monthly Watering Guide for Crookneck Squash
Crookneck Squash needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.
| Month | Crookneck Squash Needs | Rainfall | You Supplement | Action |
|---|---|---|---|---|
| Jan | โ | 4.5" | 0" | โ๏ธ Dormant |
| Feb | โ | 3.3" | 0" | โ๏ธ Dormant |
| Mar | โ | 3.9" | 0" | โ๏ธ Dormant |
| Apr | 4.3" | 3.2" | 1.1" | ๐ง Light watering |
| May | 4.3" | 3.6" | 0.7" | ๐ง Light watering |
| Jun | 4.3" | 4.6" | 0" | โ Rainfall sufficient |
| Jul | 4.3" | 5.1" | 0" | โ Rainfall sufficient |
| Aug | 4.3" | 4.4" | 0" | โ Rainfall sufficient |
| Sep | 4.3" | 3.2" | 1.1" | ๐ง Light watering |
| Oct | 4.3" | 3.3" | 1" | ๐ง Light watering |
| Nov | โ | 3.6" | 0" | โ๏ธ Dormant |
| Dec | โ | 3.7" | 0" | โ๏ธ Dormant |
Water needs are for active growing months only (AprโOct in Bourbon County). Supplement amounts are based on average rainfall โ actual needs vary with temperature, soil, and mulching.
Crookneck Squash Heat Requirements (GDD)
What are Growing Degree Days (GDD)?
Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" โ every day above 50ยฐF deposits warmth that helps your plants grow.
Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.
Crookneck Squash Planting Timeline โ Bourbon County, KY
Crookneck Squash Planting Calendar
| Activity | When | Date Range |
|---|---|---|
| Start Indoors | March 12 | Mar 12 โ Mar 26 |
| Transplant Outdoors | April 30 | Apr 30 โ May 14 |
| Direct Sow | April 23 | Apr 23 โ May 14 |
| Harvest | June 18 | Jun 18 โ Jul 16 |
Plant 1" deep ยท 30" apart ยท Rows 42" apart
Month-by-Month Timeline
| Month | Activities |
|---|---|
| January | โ |
| February | โ |
| March | Start Indoors |
| April | Transplant Outdoors Direct Sow |
| May | Transplant Outdoors Direct Sow |
| June | Harvest |
| July | Harvest |
| August | โ |
| September | โ |
| October | โ |
| November | โ |
| December | โ |
Growing Conditions
โ๏ธ Sun
Full Sun (6-8+ hours)
๐ง Water
1"/week ยท Natural rainfall sufficient
๐ Days to Maturity
45โ60 days
๐งช Soil pH
Needs 6โ7.5 ยท Your soil: acceptable
๐บ๏ธ USDA Zone
Zone 6b
๐ Growing Season
193 days in Bourbon County
Growing Tips for Crookneck Squash in Bourbon County
Direct sow Crookneck Squash outdoors after April 16 in Bourbon County when soil has warmed and frost danger has passed.
Your generous 193.0-day season in Bourbon County allows multiple plantings of Crookneck Squash. Sow every 22.0 days for continuous harvest.
Common pests for Crookneck Squash in this region include squash vine borer and cucumber beetles. Use row covers early in the season and inspect plants weekly.
General growing tips
Direct sow after last frost on mounds. Pick frequently while small for tender texture. Skin becomes tough and warty on larger fruits. Very productive in warm weather.
Companion Planting
Good Companions
Avoid Planting Near
Check more plant combinations with our Companion Planting Checker →
Crookneck Squash in Other Locations
Frequently Asked Questions
When should I plant Crookneck Squash in Bourbon County, KY?
Bourbon County is in Zone 6b with an average last frost of April 16. Plan your Crookneck Squash planting based on this frost date โ see the calendar above for exact timing.
What planting zone is Bourbon County, KY?
Bourbon County, Kentucky is in USDA Hardiness Zone 6b. The average last spring frost is April 16 and first fall frost is October 26.
Plan Your Garden with Confidence
Get our free Garden Planner โ designed to help Bourbon County gardeners in Zone 6b organize planting dates, track what's growing, and never miss a planting window.
Get Your Free Garden Planner →Free download. Plan your entire garden season in minutes.