Blog

When to Plant Comfrey in Laclede County, MO

Comfrey is a vigorous perennial herb valued as a dynamic accumulator of nutrients. Its leaves make excellent mulch, compost activator, and liquid fertilizer.

Laclede County, Missouri is in USDA Zone 6a. The average last spring frost is April 11 and the first fall frost is October 22, giving you a growing season of approximately 194 days.

At an elevation of 772 feet, Laclede County receives approximately 33.3 inches of rainfall annually with predominantly silt loam soil. Summer highs average 87ยฐF, providing good warmth for Comfrey during the growing season.

Laclede County, MO (Zone 6a) Moderate season
194 days
Last Spring Frost April 11
194 growing days
First Fall Frost October 22

Laclede County Soil Profile

Soil Type

Silt Loam

Soil pH

5.6-6.9

Drainage

Well Drained

Plant Planting Risk Windows

Early Start (70% safe) ✓ Fits season (54 days to spare)
Transplant: Apr 12 🍅 Harvest: Jun 14 – Aug 23
Recommended (50%) ✓ Fits season (54 days to spare)
Transplant: Apr 18 🍅 Harvest: Jun 20 – Aug 29
Safe Start (90%) ✓ Fits season (54 days to spare)
Transplant: May 2 🍅 Harvest: Jul 4 – Sep 12

Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.

Plant Water Budget

Plant needs
1.0″/week
Rainfall provides
0.7″/week
You supply
0.3″/week
Watering frequency 1-2 times/week
Season total 578 gal / 100 sq ft
Drought risk

Water stress score is 6/10 โ€” consider drought-tolerant varieties and mulching

Comfrey needs ~1,144 GDD — county provides 2,958 GDD Excellent fit

Comfrey Planting Timeline โ€” Laclede County, MO

Comfrey Planting Calendar

Activity When Date Range
Transplant Outdoors April 18 Apr 18 โ€“ May 2
Harvest June 20 Jun 20 โ€“ Aug 29

Plant 0.5" deep ยท 8" apart ยท Rows 12" apart

Month-by-Month Timeline

MonthActivities
January โ€”
February โ€”
March โ€”
April Transplant Outdoors
May Transplant Outdoors
June Harvest
July Harvest
August Harvest
September โ€”
October โ€”
November โ€”
December โ€”

Growing Conditions

Sun

Partial Shade (3-6 hours)

Water

Moderate โ€” regular watering

Days to Maturity

60โ€“90 days

Soil pH

6 โ€“ 7

USDA Zone

Zone 6a

Growing Season

194 days

Growing Tips for Laclede County

Plant root cuttings 2 inches deep. Choose Bocking 14 variety to prevent self-seeding. Cut leaves 3-4 times per season for mulch or compost. Avoid planting near pathways as it spreads.

Companion Planting

Good Companions

Level Up Your Garden

Frequently Asked Questions

When should I plant Comfrey in Laclede County, MO?

Laclede County is in Zone 6a with an average last frost of April 11. Plan your Comfrey planting based on this frost date โ€” see the calendar above for exact timing.

What planting zone is Laclede County, MO?

Laclede County, Missouri is in USDA Hardiness Zone 6a. The average last spring frost is April 11 and first fall frost is October 22.

๐ŸŒฑ

Plan Your Garden with Confidence

Get our free Garden Planner โ€” designed to help Laclede County gardeners in Zone 6a organize planting dates, track what's growing, and never miss a planting window.

Get Your Free Garden Planner →

Free download. Plan your entire garden season in minutes.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Laclede County, MO. Local conditions may vary. Last updated: April 2026.