Blog

When to Plant Che Fruit in Richmond County, VA

Che fruit (Chinese mulberry) is a small, cold-hardy tree producing round, red fruits with a sweet, watermelon-fig flavor. It is an underutilized fruit tree with great potential.

Richmond County, Virginia is in USDA Zone 7a. The average last spring frost is April 6 and the first fall frost is November 2, giving you a growing season of approximately 210 days.

At an elevation of 148 feet, Richmond County receives approximately 49.3 inches of rainfall annually with predominantly silt loam soil. Summer highs average 91ยฐF, providing good warmth for Che Fruit during the growing season.

Richmond County, VA (Zone 7a) Long season
210 days
Last Spring Frost April 6
210 growing days
First Fall Frost November 2

Richmond County Soil Profile

Soil Type

Silt Loam

Soil pH

5.3-7.1

Drainage

Well Drained

Plant Planting Risk Windows

Early Start (70% safe) ✓ Fits season
Transplant: Apr 20
Recommended (50%) ✓ Fits season
Transplant: Apr 27
Safe Start (90%) ✓ Fits season
Transplant: May 10

Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.

Soil Compatibility in Richmond County

How your county's soil matches Che Fruit's growing requirements.

Soil pH

Your soil pH (5.3โ€“7.1) overlaps with Che Fruit's range (6.0โ€“7.5), though not a perfect match.

Soil Texture

The silt loam soil in Richmond County is excellent for Che Fruit โ€” good drainage, moisture retention, and nutrient holding capacity.

Organic Matter

Organic matter is moderate (2.6%). Annual compost additions will help Che Fruit.

How to Plant Che Fruit

120"
Between Plants
144"
Between Rows

Plant Water Budget

Plant needs
1.0″/week
Rainfall provides
1.0″/week
You supply
0.0″/week
Watering frequency Only during dry spells
Season total 26 gal / 100 sq ft

Monthly Watering Guide for Che Fruit

Che Fruit needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.

Month Che Fruit Needs Rainfall You Supplement Action
Jan โ€” 3.8" 0" โ„๏ธ Dormant
Feb โ€” 3.9" 0" โ„๏ธ Dormant
Mar โ€” 4.3" 0" โ„๏ธ Dormant
Apr 4.3" 3.3" 1" ๐Ÿ’ง Light watering
May 4.3" 4.3" 0" โœ… Rainfall sufficient
Jun 4.3" 5" 0" โœ… Rainfall sufficient
Jul 4.3" 5.4" 0" โœ… Rainfall sufficient
Aug 4.3" 4.6" 0" โœ… Rainfall sufficient
Sep 4.3" 4.1" 0.2" ๐Ÿ’ง Light watering
Oct 4.3" 3.4" 0.9" ๐Ÿ’ง Light watering
Nov 4.3" 3.4" 0.9" ๐Ÿ’ง Light watering
Dec โ€” 3.9" 0" โ„๏ธ Dormant

Water needs are for active growing months only (Aprโ€“Nov in Richmond County). Supplement amounts are based on average rainfall โ€” actual needs vary with temperature, soil, and mulching.

Che Fruit Heat Requirements (GDD)

What are Growing Degree Days (GDD)?

Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" โ€” every day above 50ยฐF deposits warmth that helps your plants grow.

Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.

Che Fruit needs ~26,645 GDD — county provides 3,832 GDD May not mature

Che Fruit Planting Timeline โ€” Richmond County, VA

Che Fruit Planting Calendar

Activity When Date Range
Transplant Outdoors April 27 Apr 27 โ€“ May 11

ยท 120" apart ยท Rows 144" apart

Month-by-Month Timeline

MonthActivities
January โ€”
February โ€”
March โ€”
April Transplant Outdoors
May Transplant Outdoors
June โ€”
July โ€”
August โ€”
September โ€”
October โ€”
November โ€”
December โ€”

Growing Conditions

โ˜€๏ธ Sun

Full Sun (6-8+ hours)

๐Ÿ’ง Water

1"/week ยท Only during dry spells

๐Ÿ“… Days to Maturity

1095โ€“1825 days

๐Ÿงช Soil pH

Needs 6โ€“7.5 ยท Your soil: acceptable

๐Ÿ—บ๏ธ USDA Zone

Zone 7a

๐Ÿ“† Growing Season

210 days in Richmond County

Growing Tips for Che Fruit in Richmond County

Direct sow Che Fruit outdoors after April 06 in Richmond County when soil has warmed and frost danger has passed.

Your 210.0-day growing season in Richmond County is tight for Che Fruit (1095.0-1825.0 days to maturity). Start indoors and choose early-maturing varieties.

General growing tips

Plant in well-drained soil. A male pollinator is needed for seeded fruit, but seedless fruit can set parthenocarpically. Minimal pruning required. Fruits ripen in late summer.

Companion Planting

Good Companions

Check more plant combinations with our Companion Planting Checker →

Frequently Asked Questions

When should I plant Che Fruit in Richmond County, VA?

Richmond County is in Zone 7a with an average last frost of April 6. Plan your Che Fruit planting based on this frost date โ€” see the calendar above for exact timing.

What planting zone is Richmond County, VA?

Richmond County, Virginia is in USDA Hardiness Zone 7a. The average last spring frost is April 6 and first fall frost is November 2.

๐ŸŒฑ

Plan Your Garden with Confidence

Get our free Garden Planner โ€” designed to help Richmond County gardeners in Zone 7a organize planting dates, track what's growing, and never miss a planting window.

Get Your Free Garden Planner →

Free download. Plan your entire garden season in minutes.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Richmond County, VA. Local conditions may vary. Last updated: April 2026.