Blog

When to Plant Che Fruit in Summit County, UT

Che fruit (Chinese mulberry) is a small, cold-hardy tree producing round, red fruits with a sweet, watermelon-fig flavor. It is an underutilized fruit tree with great potential.

Summit County, Utah is in USDA Zone 5a. The average last spring frost is June 10 and the first fall frost is September 12, giving you a growing season of approximately 94 days.

At an elevation of 8,145 feet, Summit County receives approximately 24.8 inches of rainfall annually with predominantly loam soil. Summer highs average 86ยฐF, providing good warmth for Che Fruit during the growing season.

Summit County, UT (Zone 5a) Very short season
94 days
Last Spring Frost June 10
94 growing days
First Fall Frost September 12

Summit County Soil Profile

Soil Type

Loam

Soil pH

6.4-8.3

Drainage

Well Drained

Plant Planting Risk Windows

Early Start (70% safe) ✓ Fits season
Transplant: Jun 20
Recommended (50%) ✓ Fits season
Transplant: Jul 1
Safe Start (90%) ✓ Fits season
Transplant: Jul 12

Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.

Soil Compatibility in Summit County

How your county's soil matches Che Fruit's growing requirements.

Soil pH

Your soil pH (6.4โ€“8.3) overlaps with Che Fruit's range (6.0โ€“7.5), though not a perfect match.

Soil Texture

The loam soil in Summit County is excellent for Che Fruit โ€” good drainage, moisture retention, and nutrient holding capacity.

Organic Matter

Organic matter is moderate (2.3%). Annual compost additions will help Che Fruit.

How to Plant Che Fruit

120"
Between Plants
144"
Between Rows

Plant Water Budget

Plant needs
1.0″/week
Rainfall provides
1.1″/week
Watering frequency Natural rainfall sufficient
Season total 0 gal / 100 sq ft
Drought risk

Water stress score is 8/10 โ€” consider drought-tolerant varieties and mulching

Monthly Watering Guide for Che Fruit

Che Fruit needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.

Month Che Fruit Needs Rainfall You Supplement Action
Jan โ€” 1.6" 0" โ„๏ธ Dormant
Feb โ€” 1.3" 0" โ„๏ธ Dormant
Mar โ€” 2.4" 0" โ„๏ธ Dormant
Apr โ€” 2.9" 0" โ„๏ธ Dormant
May โ€” 2.9" 0" โ„๏ธ Dormant
Jun 4.3" 1.8" 2.5" ๐Ÿšฟ Regular watering
Jul 4.3" 1.9" 2.4" ๐Ÿšฟ Regular watering
Aug 4.3" 2.5" 1.8" ๐Ÿ’ง Light watering
Sep 4.3" 2" 2.3" ๐Ÿšฟ Regular watering
Oct โ€” 2.1" 0" โ„๏ธ Dormant
Nov โ€” 2" 0" โ„๏ธ Dormant
Dec โ€” 1.4" 0" โ„๏ธ Dormant

Water needs are for active growing months only (Junโ€“Sep in Summit County). Supplement amounts are based on average rainfall โ€” actual needs vary with temperature, soil, and mulching.

Che Fruit Heat Requirements (GDD)

What are Growing Degree Days (GDD)?

Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" โ€” every day above 50ยฐF deposits warmth that helps your plants grow.

Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.

Che Fruit needs ~21,170 GDD — county provides 1,363 GDD May not mature

Che Fruit Planting Timeline โ€” Summit County, UT

Che Fruit Planting Calendar

Activity When Date Range
Transplant Outdoors July 1 Jul 1 โ€“ Jul 15

ยท 120" apart ยท Rows 144" apart

Month-by-Month Timeline

MonthActivities
January โ€”
February โ€”
March โ€”
April โ€”
May โ€”
June โ€”
July Transplant Outdoors
August โ€”
September โ€”
October โ€”
November โ€”
December โ€”

Growing Conditions

โ˜€๏ธ Sun

Full Sun (6-8+ hours)

๐Ÿ’ง Water

1"/week ยท Natural rainfall sufficient

๐Ÿ“… Days to Maturity

1095โ€“1825 days

๐Ÿงช Soil pH

Needs 6โ€“7.5 ยท Your soil: acceptable

๐Ÿ—บ๏ธ USDA Zone

Zone 5a

๐Ÿ“† Growing Season

94 days in Summit County

Growing Tips for Che Fruit in Summit County

Direct sow Che Fruit outdoors after June 10 in Summit County when soil has warmed and frost danger has passed.

Your 94.0-day growing season in Summit County is tight for Che Fruit (1095.0-1825.0 days to maturity). Start indoors and choose early-maturing varieties.

Summit County receives only 25" of rain annually. Che Fruit needs consistent moisture โ€” install drip irrigation or water deeply 2-3 times per week.

General growing tips

Plant in well-drained soil. A male pollinator is needed for seeded fruit, but seedless fruit can set parthenocarpically. Minimal pruning required. Fruits ripen in late summer.

Companion Planting

Good Companions

Check more plant combinations with our Companion Planting Checker →

Frequently Asked Questions

When should I plant Che Fruit in Summit County, UT?

Summit County is in Zone 5a with an average last frost of June 10. Plan your Che Fruit planting based on this frost date โ€” see the calendar above for exact timing.

What planting zone is Summit County, UT?

Summit County, Utah is in USDA Hardiness Zone 5a. The average last spring frost is June 10 and first fall frost is September 12.

๐ŸŒฑ

Plan Your Garden with Confidence

Get our free Garden Planner โ€” designed to help Summit County gardeners in Zone 5a organize planting dates, track what's growing, and never miss a planting window.

Get Your Free Garden Planner →

Free download. Plan your entire garden season in minutes.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Summit County, UT. Local conditions may vary. Last updated: April 2026.