When to Plant Che Fruit in Johnson County, TN
Che fruit (Chinese mulberry) is a small, cold-hardy tree producing round, red fruits with a sweet, watermelon-fig flavor. It is an underutilized fruit tree with great potential.
Johnson County, Tennessee is in USDA Zone 6b. The average last spring frost is April 14 and the first fall frost is October 22, giving you a growing season of approximately 191 days.
At an elevation of 404 feet, Johnson County receives approximately 43.2 inches of rainfall annually with predominantly silt loam soil. Summer highs average 86ยฐF, providing good warmth for Che Fruit during the growing season.
Johnson County Soil Profile
Soil Type
Silt Loam
Soil pH
5.7-7.1
Drainage
Well Drained
Plant Planting Risk Windows
Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.
Soil Compatibility in Johnson County
How your county's soil matches Che Fruit's growing requirements.
Soil pH
Your soil pH (5.7โ7.1) overlaps with Che Fruit's range (6.0โ7.5), though not a perfect match.
Soil Texture
The silt loam soil in Johnson County is excellent for Che Fruit โ good drainage, moisture retention, and nutrient holding capacity.
Organic Matter
Organic matter is moderate (2.5%). Annual compost additions will help Che Fruit.
How to Plant Che Fruit
Plant Water Budget
Water stress score is 6/10 โ consider drought-tolerant varieties and mulching
Monthly Watering Guide for Che Fruit
Che Fruit needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.
| Month | Che Fruit Needs | Rainfall | You Supplement | Action |
|---|---|---|---|---|
| Jan | โ | 4" | 0" | โ๏ธ Dormant |
| Feb | โ | 3.4" | 0" | โ๏ธ Dormant |
| Mar | โ | 4.5" | 0" | โ๏ธ Dormant |
| Apr | 4.3" | 3.2" | 1.1" | ๐ง Light watering |
| May | 4.3" | 3.7" | 0.6" | ๐ง Light watering |
| Jun | 4.3" | 3.4" | 0.9" | ๐ง Light watering |
| Jul | 4.3" | 4" | 0.3" | ๐ง Light watering |
| Aug | 4.3" | 4.2" | 0.1" | ๐ง Light watering |
| Sep | 4.3" | 3.5" | 0.8" | ๐ง Light watering |
| Oct | 4.3" | 2.8" | 1.5" | ๐ง Light watering |
| Nov | โ | 3" | 0" | โ๏ธ Dormant |
| Dec | โ | 3.7" | 0" | โ๏ธ Dormant |
Water needs are for active growing months only (AprโOct in Johnson County). Supplement amounts are based on average rainfall โ actual needs vary with temperature, soil, and mulching.
Che Fruit Heat Requirements (GDD)
What are Growing Degree Days (GDD)?
Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" โ every day above 50ยฐF deposits warmth that helps your plants grow.
Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.
Che Fruit Planting Timeline โ Johnson County, TN
Che Fruit Planting Calendar
| Activity | When | Date Range |
|---|---|---|
| Transplant Outdoors | May 5 | May 5 โ May 19 |
ยท 120" apart ยท Rows 144" apart
Month-by-Month Timeline
| Month | Activities |
|---|---|
| January | โ |
| February | โ |
| March | โ |
| April | โ |
| May | Transplant Outdoors |
| June | โ |
| July | โ |
| August | โ |
| September | โ |
| October | โ |
| November | โ |
| December | โ |
Growing Conditions
โ๏ธ Sun
Full Sun (6-8+ hours)
๐ง Water
1"/week ยท Only during dry spells
๐ Days to Maturity
1095โ1825 days
๐งช Soil pH
Needs 6โ7.5 ยท Your soil: acceptable
๐บ๏ธ USDA Zone
Zone 6b
๐ Growing Season
191 days in Johnson County
Growing Tips for Che Fruit in Johnson County
Direct sow Che Fruit outdoors after April 14 in Johnson County when soil has warmed and frost danger has passed.
Your 191.0-day growing season in Johnson County is tight for Che Fruit (1095.0-1825.0 days to maturity). Start indoors and choose early-maturing varieties.
General growing tips
Plant in well-drained soil. A male pollinator is needed for seeded fruit, but seedless fruit can set parthenocarpically. Minimal pruning required. Fruits ripen in late summer.
Companion Planting
Good Companions
Check more plant combinations with our Companion Planting Checker →
Che Fruit in Other Locations
Frequently Asked Questions
When should I plant Che Fruit in Johnson County, TN?
Johnson County is in Zone 6b with an average last frost of April 14. Plan your Che Fruit planting based on this frost date โ see the calendar above for exact timing.
What planting zone is Johnson County, TN?
Johnson County, Tennessee is in USDA Hardiness Zone 6b. The average last spring frost is April 14 and first fall frost is October 22.
Plan Your Garden with Confidence
Get our free Garden Planner โ designed to help Johnson County gardeners in Zone 6b organize planting dates, track what's growing, and never miss a planting window.
Get Your Free Garden Planner →Free download. Plan your entire garden season in minutes.