Blog

When to Plant Chamomile in Brevard County, FL

Chamomile is a daisy-like herb famous for its calming, apple-scented tea. German chamomile is an annual while Roman chamomile is a perennial ground cover.

Brevard County, Florida is in USDA Zone 9b. The average last spring frost is January 19 and the first fall frost is December 20, giving you a growing season of approximately 335 days.

At an elevation of 491 feet, Brevard County receives approximately 52.7 inches of rainfall annually with predominantly sand soil. Summer highs average 104ยฐF, so Chamomile may need afternoon shade and extra watering during peak heat. Sandy soil warms quickly in spring โ€” great for early planting โ€” but Chamomile will need more frequent watering and organic matter to retain nutrients. Ample rainfall means less supplemental watering, but ensure good drainage to prevent Chamomile root diseases.

Brevard County, FL (Zone 9b) Year-round
335 days
Last Spring Frost January 19
335 growing days
First Fall Frost December 20

Brevard County Soil Profile

Soil Type

Sand

Soil pH

4.8-5.9

Drainage

Well Drained

Plant Planting Risk Windows

Early Start (70% safe) ✓ Fits season (212 days to spare)
Start indoors: Dec 16 Transplant: Jan 6 🍅 Harvest: Mar 10 – May 19
Recommended (50%) ✓ Fits season (209 days to spare)
Start indoors: Dec 22 Transplant: Jan 12 🍅 Harvest: Mar 16 – May 25
Safe Start (90%) ✓ Fits season (184 days to spare)
Start indoors: Jan 20 Transplant: Feb 10 🍅 Harvest: Apr 14 – Jun 23

Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.

Plant Water Budget

Plant needs
1.0″/week
Rainfall provides
0.7″/week
You supply
0.8″/week
Watering frequency 2-3 times/week
Season total 2,301 gal / 100 sq ft
Drought risk

Water stress score is 6/10 โ€” consider drought-tolerant varieties and mulching

Chamomile needs ~2,100 GDD — county provides 9,408 GDD Excellent fit

Chamomile Planting Timeline โ€” Brevard County, FL

Chamomile Planting Calendar

Activity When Date Range
Start Indoors December 22 Dec 22 โ€“ Jan 5
Transplant Outdoors January 12 Jan 12 โ€“ Jan 26
Direct Sow December 29 Dec 29 โ€“ Jan 19
Fall Sowing October 25 Oct 25 โ€“ Nov 8
Harvest March 16 Mar 16 โ€“ May 25

Plant 0.5" deep ยท 8" apart ยท Rows 12" apart

Month-by-Month Timeline

MonthActivities
January Start Indoors Transplant Outdoors Direct Sow
February โ€”
March Harvest
April Harvest
May Harvest
June โ€”
July โ€”
August โ€”
September โ€”
October Fall Sowing
November Fall Sowing
December Start Indoors Direct Sow

Growing Conditions

Sun

Full Sun (6-8+ hours)

Water

Moderate โ€” regular watering

Days to Maturity

60โ€“90 days

Soil pH

5.6 โ€“ 7.5

USDA Zone

Zone 9b

Growing Season

335 days

Growing Tips for Brevard County

Direct sow on the soil surface as seeds need light. Harvest flowers when petals begin to curl back. Chamomile self-sows freely and improves the health of nearby plants.

Companion Planting

Good Companions

Level Up Your Garden

Frequently Asked Questions

When should I plant Chamomile in Brevard County, FL?

Brevard County is in Zone 9b with an average last frost of January 19. Plan your Chamomile planting based on this frost date โ€” see the calendar above for exact timing.

What planting zone is Brevard County, FL?

Brevard County, Florida is in USDA Hardiness Zone 9b. The average last spring frost is January 19 and first fall frost is December 20.

๐ŸŒฑ

Plan Your Garden with Confidence

Get our free Garden Planner โ€” designed to help Brevard County gardeners in Zone 9b organize planting dates, track what's growing, and never miss a planting window.

Get Your Free Garden Planner →

Free download. Plan your entire garden season in minutes.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Brevard County, FL. Local conditions may vary. Last updated: April 2026.