Blog

When to Plant Celery in Webster County, MO

Celery is a marshland plant that requires consistent moisture and cool temperatures to produce crisp, flavorful stalks. It is a rewarding but demanding garden crop.

Webster County, Missouri is in USDA Zone 6a. The average last spring frost is April 11 and the first fall frost is October 22, giving you a growing season of approximately 194 days.

At an elevation of 1,274 feet, Webster County receives approximately 38.4 inches of rainfall annually with predominantly silt loam soil. Summer highs average 89ยฐF, providing good warmth for Celery during the growing season.

Webster County, MO (Zone 6a) Moderate season
194 days
Last Spring Frost April 11
194 growing days
First Fall Frost October 22

Webster County Soil Profile

Soil Type

Silt Loam

Soil pH

5.6-6.6

Drainage

Well Drained

Plant Planting Risk Windows

Early Start (70% safe) ✓ Fits season (54 days to spare)
Start indoors: Mar 1 Transplant: Apr 5 🍅 Harvest: Jun 28 – Aug 23
Recommended (50%) ✓ Fits season (54 days to spare)
Start indoors: Mar 7 Transplant: Apr 11 🍅 Harvest: Jul 4 – Aug 29
Safe Start (90%) ✓ Fits season (56 days to spare)
Start indoors: Mar 19 Transplant: Apr 23 🍅 Harvest: Jul 16 – Sep 10

Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.

Soil Compatibility in Webster County

How your county's soil matches Celery's growing requirements.

Soil pH

Your soil pH (5.6โ€“6.6) overlaps with Celery's range (6.0โ€“7.0), though not a perfect match.

Soil Texture

The silt loam soil in Webster County is excellent for Celery โ€” good drainage, moisture retention, and nutrient holding capacity.

Drainage

Drainage is adequate for Celery.

Organic Matter

Organic matter is moderate (2.6%). Annual compost additions will help Celery.

How to Plant Celery

1"
Planting Depth
15"
Between Plants
24"
Between Rows

Fall planting: Sow 10 weeks before your first frost date for a fall harvest.

Succession Planting Celery

2
successive plantings in your 194-day season

Sow every 9.1 weeks. Last sowing by Jun 24 to harvest before frost.

For a dedicated fall crop, sow by Aug 13.

Plant Water Budget

Plant needs
1.3″/week
Rainfall provides
0.8″/week
You supply
0.1″/week
Watering frequency Only during dry spells
Season total 136 gal / 100 sq ft

Monthly Watering Guide for Celery

Celery needs approximately 1.3 inches of water per week (5.6" per month). Here's how your county's rainfall compares month by month.

Month Celery Needs Rainfall You Supplement Action
Jan โ€” 1.6" 0" โ„๏ธ Dormant
Feb โ€” 1.5" 0" โ„๏ธ Dormant
Mar โ€” 2.8" 0" โ„๏ธ Dormant
Apr 5.6" 4.2" 1.4" ๐Ÿ’ง Light watering
May 5.6" 5" 0.6" ๐Ÿ’ง Light watering
Jun 5.6" 4.2" 1.4" ๐Ÿ’ง Light watering
Jul 5.6" 4.4" 1.2" ๐Ÿ’ง Light watering
Aug 5.6" 4.4" 1.2" ๐Ÿ’ง Light watering
Sep 5.6" 3" 2.6" ๐Ÿ’ง Light watering
Oct 5.6" 3" 2.6" ๐Ÿ’ง Light watering
Nov โ€” 2.4" 0" โ„๏ธ Dormant
Dec โ€” 1.8" 0" โ„๏ธ Dormant

Water needs are for active growing months only (Aprโ€“Oct in Webster County). Supplement amounts are based on average rainfall โ€” actual needs vary with temperature, soil, and mulching.

Celery Heat Requirements (GDD)

What are Growing Degree Days (GDD)?

Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" โ€” every day above 50ยฐF deposits warmth that helps your plants grow.

Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.

Celery needs ~1,675 GDD — county provides 3,249 GDD Excellent fit

Celery Planting Timeline โ€” Webster County, MO

Celery Planting Calendar

Activity When Date Range
Start Indoors March 7 Mar 7 โ€“ Mar 21
Transplant Outdoors April 11 Apr 11 โ€“ Apr 25
Direct Sow March 28 Mar 28 โ€“ Apr 18
Harvest July 4 Jul 4 โ€“ Aug 29
Fall Sowing August 13 Aug 13 โ€“ Aug 27

Plant 1" deep ยท 15" apart ยท Rows 24" apart

Month-by-Month Timeline

MonthActivities
January โ€”
February โ€”
March Start Indoors Direct Sow
April Transplant Outdoors Direct Sow
May โ€”
June โ€”
July Harvest
August Fall Sowing Harvest
September โ€”
October โ€”
November โ€”
December โ€”

Growing Conditions

โ˜€๏ธ Sun

Full Sun (6-8+ hours)

๐Ÿ’ง Water

1.3"/week ยท Only during dry spells

๐Ÿ“… Days to Maturity

80โ€“120 days

๐Ÿงช Soil pH

Needs 6โ€“7 ยท Your soil: acceptable

๐Ÿ—บ๏ธ USDA Zone

Zone 6a

๐Ÿ“† Growing Season

194 days in Webster County

Growing Tips for Celery in Webster County

Direct sow Celery outdoors after April 11 in Webster County when soil has warmed and frost danger has passed.

Common pests for Celery in this region include carrot rust fly and parsleyworm. Use row covers early in the season and inspect plants weekly.

General growing tips

Start seeds indoors 10-12 weeks before last frost. Keep soil consistently moist and never let it dry out. Blanch stalks by mounding soil or using collars for milder flavor.

Companion Planting

Good Companions

Avoid Planting Near

  • Carrots
  • Parsnip

Check more plant combinations with our Companion Planting Checker →

Frequently Asked Questions

When should I plant Celery in Webster County, MO?

Webster County is in Zone 6a with an average last frost of April 11. Plan your Celery planting based on this frost date โ€” see the calendar above for exact timing.

What planting zone is Webster County, MO?

Webster County, Missouri is in USDA Hardiness Zone 6a. The average last spring frost is April 11 and first fall frost is October 22.

๐ŸŒฑ

Plan Your Garden with Confidence

Get our free Garden Planner โ€” designed to help Webster County gardeners in Zone 6a organize planting dates, track what's growing, and never miss a planting window.

Get Your Free Garden Planner →

Free download. Plan your entire garden season in minutes.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Webster County, MO. Local conditions may vary. Last updated: April 2026.