When to Plant Butternut Squash in Clark County, MO
Butternut squash is a popular winter squash with a long neck, small seed cavity, and sweet, nutty orange flesh. It stores exceptionally well for months.
Clark County, Missouri is in USDA Zone 5b. The average last spring frost is April 16 and the first fall frost is October 18, giving you a growing season of approximately 185 days.
At an elevation of 833 feet, Clark County receives approximately 33 inches of rainfall annually with predominantly silt loam soil. Summer highs average 87ยฐF, providing good warmth for Butternut Squash during the growing season.
Clark County Soil Profile
Soil Type
Silt Loam
Soil pH
5.6-6.6
Drainage
Well Drained
Plant Planting Risk Windows
Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.
Soil Compatibility in Clark County
How your county's soil matches Butternut Squash's growing requirements.
Soil pH
Your soil pH (5.6โ6.6) overlaps with Butternut Squash's range (6.0โ7.0), though not a perfect match.
Soil Texture
The silt loam soil in Clark County is excellent for Butternut Squash โ good drainage, moisture retention, and nutrient holding capacity.
Organic Matter
Organic matter is moderate (2.6%). Annual compost additions will help Butternut Squash.
How to Plant Butternut Squash
Plant Water Budget
Monthly Watering Guide for Butternut Squash
Butternut Squash needs approximately 1.1 inches of water per week (4.8" per month). Here's how your county's rainfall compares month by month.
| Month | Butternut Squash Needs | Rainfall | You Supplement | Action |
|---|---|---|---|---|
| Jan | โ | 1.4" | 0" | โ๏ธ Dormant |
| Feb | โ | 1.4" | 0" | โ๏ธ Dormant |
| Mar | โ | 1.9" | 0" | โ๏ธ Dormant |
| Apr | 4.8" | 3.3" | 1.5" | ๐ง Light watering |
| May | 4.8" | 4.1" | 0.7" | ๐ง Light watering |
| Jun | 4.8" | 3.7" | 1.1" | ๐ง Light watering |
| Jul | 4.8" | 3.3" | 1.5" | ๐ง Light watering |
| Aug | 4.8" | 3.7" | 1.1" | ๐ง Light watering |
| Sep | 4.8" | 3.2" | 1.6" | ๐ง Light watering |
| Oct | 4.8" | 2.6" | 2.2" | ๐ง Light watering |
| Nov | โ | 2.5" | 0" | โ๏ธ Dormant |
| Dec | โ | 1.8" | 0" | โ๏ธ Dormant |
Water needs are for active growing months only (AprโOct in Clark County). Supplement amounts are based on average rainfall โ actual needs vary with temperature, soil, and mulching.
Butternut Squash Heat Requirements (GDD)
What are Growing Degree Days (GDD)?
Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" โ every day above 50ยฐF deposits warmth that helps your plants grow.
Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.
Butternut Squash Planting Timeline โ Clark County, MO
Butternut Squash Planting Calendar
| Activity | When | Date Range |
|---|---|---|
| Start Indoors | March 12 | Mar 12 โ Mar 26 |
| Transplant Outdoors | April 30 | Apr 30 โ May 14 |
| Direct Sow | April 23 | Apr 23 โ May 14 |
| Harvest | July 30 | Jul 30 โ Sep 3 |
Plant 1" deep ยท 30" apart ยท Rows 42" apart
Month-by-Month Timeline
| Month | Activities |
|---|---|
| January | โ |
| February | โ |
| March | Start Indoors |
| April | Transplant Outdoors Direct Sow |
| May | Transplant Outdoors Direct Sow |
| June | โ |
| July | Harvest |
| August | Harvest |
| September | Harvest |
| October | โ |
| November | โ |
| December | โ |
Growing Conditions
โ๏ธ Sun
Full Sun (6-8+ hours)
๐ง Water
1.1"/week ยท 1-2 times/week
๐ Days to Maturity
85โ110 days
๐งช Soil pH
Needs 6โ7 ยท Your soil: acceptable
๐บ๏ธ USDA Zone
Zone 5b
๐ Growing Season
185 days in Clark County
Growing Tips for Butternut Squash in Clark County
Direct sow Butternut Squash outdoors after April 16 in Clark County when soil has warmed and frost danger has passed.
Common pests for Butternut Squash in this region include squash vine borer and cucumber beetles. Use row covers early in the season and inspect plants weekly.
General growing tips
Start seeds indoors 3 weeks early or direct sow after frost. Allow 6-8 feet for sprawling vines. Harvest when the skin is hard and uniformly tan. Cure in the sun for 10 days.
Companion Planting
Good Companions
Avoid Planting Near
Check more plant combinations with our Companion Planting Checker →
Butternut Squash in Other Locations
Frequently Asked Questions
When should I plant Butternut Squash in Clark County, MO?
Clark County is in Zone 5b with an average last frost of April 16. Plan your Butternut Squash planting based on this frost date โ see the calendar above for exact timing.
What planting zone is Clark County, MO?
Clark County, Missouri is in USDA Hardiness Zone 5b. The average last spring frost is April 16 and first fall frost is October 18.
Plan Your Garden with Confidence
Get our free Garden Planner โ designed to help Clark County gardeners in Zone 5b organize planting dates, track what's growing, and never miss a planting window.
Get Your Free Garden Planner →Free download. Plan your entire garden season in minutes.