Blog

When to Plant Bee Balm in Miller County, MO

Bee balm is a native perennial herb with shaggy, scarlet flower heads that attract hummingbirds, bees, and butterflies. Its leaves make an aromatic tea reminiscent of Earl Grey.

Miller County, Missouri is in USDA Zone 6a. The average last spring frost is April 6 and the first fall frost is October 27, giving you a growing season of approximately 204 days.

At an elevation of 1,086 feet, Miller County receives approximately 30.8 inches of rainfall annually with predominantly silt loam soil. Summer highs average 89ยฐF, providing good warmth for Bee Balm during the growing season.

Miller County, MO (Zone 6a) Long season
204 days
Last Spring Frost April 6
204 growing days
First Fall Frost October 27

Miller County Soil Profile

Soil Type

Silt Loam

Soil pH

5.7-6.7

Drainage

Well Drained

Monthly Watering Guide for Bee Balm

Bee Balm needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.

Month Bee Balm Needs Rainfall You Supplement Action
Jan โ€” 1.4" 0" โ„๏ธ Dormant
Feb โ€” 1.2" 0" โ„๏ธ Dormant
Mar โ€” 1.9" 0" โ„๏ธ Dormant
Apr 4.3" 3.4" 0.9" ๐Ÿ’ง Light watering
May 4.3" 4.2" 0.1" ๐Ÿ’ง Light watering
Jun 4.3" 3.6" 0.7" ๐Ÿ’ง Light watering
Jul 4.3" 3.1" 1.2" ๐Ÿ’ง Light watering
Aug 4.3" 3.1" 1.2" ๐Ÿ’ง Light watering
Sep 4.3" 3.1" 1.2" ๐Ÿ’ง Light watering
Oct 4.3" 2.4" 1.9" ๐Ÿ’ง Light watering
Nov โ€” 1.8" 0" โ„๏ธ Dormant
Dec โ€” 1.6" 0" โ„๏ธ Dormant

Water needs are for active growing months only (Aprโ€“Oct in Miller County). Supplement amounts are based on average rainfall โ€” actual needs vary with temperature, soil, and mulching.

Bee Balm Planting Timeline โ€” Miller County, MO

Bee Balm Planting Calendar

Activity When Date Range
Transplant Outdoors April 13 Apr 13 โ€“ Apr 27
Harvest July 13 Jul 13 โ€“ Sep 28

Plant 0.5" deep ยท 8" apart ยท Rows 12" apart

Month-by-Month Timeline

MonthActivities
January โ€”
February โ€”
March โ€”
April Transplant Outdoors
May โ€”
June โ€”
July Harvest
August Harvest
September Harvest
October โ€”
November โ€”
December โ€”

Growing Conditions

โ˜€๏ธ Sun

Full Sun (6-8+ hours)

๐Ÿ’ง Water

Moderate โ€” regular watering

๐Ÿ“… Days to Maturity

90โ€“120 days

๐Ÿงช Soil pH

Needs 6โ€“7 ยท Your soil: N/A

๐Ÿ—บ๏ธ USDA Zone

Zone 6a

๐Ÿ“† Growing Season

204 days in Miller County

Growing Tips for Miller County

Start from seed, divisions, or transplants. Provide good air circulation to prevent powdery mildew. Deadhead spent flowers for reblooming. Divide clumps every 3 years.

Companion Planting

Good Companions

Check more plant combinations with our Companion Planting Checker →

Frequently Asked Questions

When should I plant Bee Balm in Miller County, MO?

Miller County is in Zone 6a with an average last frost of April 6. Plan your Bee Balm planting based on this frost date โ€” see the calendar above for exact timing.

What planting zone is Miller County, MO?

Miller County, Missouri is in USDA Hardiness Zone 6a. The average last spring frost is April 6 and first fall frost is October 27.

๐ŸŒฑ

Plan Your Garden with Confidence

Get our free Garden Planner โ€” designed to help Miller County gardeners in Zone 6a organize planting dates, track what's growing, and never miss a planting window.

Get Your Free Garden Planner →

Free download. Plan your entire garden season in minutes.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Miller County, MO. Local conditions may vary. Last updated: April 2026.