When to Plant Spinach in Cusick, WA
Spinach is a nutrient-packed cool-season green that grows quickly in spring and fall. It is rich in iron, vitamins, and antioxidants and excellent raw or cooked.
Cusick, Washington is in USDA Zone 6a. The average last spring frost is May 10 and the first fall frost is September 23, giving you a growing season of approximately 136 days.
At an elevation of 3,807 feet, Pend Oreille County receives approximately 13.2 inches of rainfall annually with predominantly silt loam soil. Summer highs average 86°F, providing good warmth for Spinach during the growing season. With low rainfall, drip irrigation is essential for growing Spinach successfully. Mulch heavily to conserve soil moisture.
Cusick Soil Profile
Soil Type
Silt Loam
Soil pH
5.3-6.6
Drainage
Well Drained
Monthly Watering Guide for Spinach
Spinach needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.
| Month | Spinach Needs | Rainfall | You Supplement | Action |
|---|---|---|---|---|
| Jan | — | 1.8" | 0" | ❄️ Dormant |
| Feb | — | 1.4" | 0" | ❄️ Dormant |
| Mar | — | 1.3" | 0" | ❄️ Dormant |
| Apr | — | 0.9" | 0" | ❄️ Dormant |
| May | 4.3" | 0.8" | 3.5" | 🚿 Regular watering |
| Jun | 4.3" | 0.5" | 3.8" | 🚿 Regular watering |
| Jul | 4.3" | 0.2" | 4.1" | 🚿 Regular watering |
| Aug | 4.3" | 0.2" | 4.1" | 🚿 Regular watering |
| Sep | 4.3" | 0.6" | 3.7" | 🚿 Regular watering |
| Oct | — | 1.3" | 0" | ❄️ Dormant |
| Nov | — | 2.1" | 0" | ❄️ Dormant |
| Dec | — | 1.9" | 0" | ❄️ Dormant |
Water needs are for active growing months only (May–Sep in Pend Oreille County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.
Spinach Planting Timeline — Cusick, WA
Spinach Planting Calendar
| Activity | When | Date Range |
|---|---|---|
| Start Indoors | April 5 | Apr 5 – Apr 19 |
| Transplant Outdoors | May 10 | May 10 – May 24 |
| Direct Sow | April 26 | Apr 26 – May 17 |
| Harvest | June 14 | Jun 14 – Aug 16 |
| Fall Sowing | July 15 | Jul 15 – Jul 29 |
Plant 0.5" deep · 6" apart · Rows 12" apart
Month-by-Month Timeline
| Month | Activities |
|---|---|
| January | — |
| February | — |
| March | — |
| April | Start Indoors Direct Sow |
| May | Transplant Outdoors Direct Sow |
| June | Harvest |
| July | Fall Sowing Harvest |
| August | Harvest |
| September | — |
| October | — |
| November | — |
| December | — |
Growing Conditions
☀️ Sun
Partial Shade (3-6 hours)
💧 Water
Moderate — regular watering
📅 Days to Maturity
35–50 days
🧪 Soil pH
Needs 6.5–7.5 · Your soil: N/A
🗺️ USDA Zone
Zone 6a
📆 Growing Season
136 days in Pend Oreille County
Growing Tips for Cusick
Direct sow as soon as soil can be worked in spring. Plant in partial shade for summer crops to delay bolting. Succession plant every 2 weeks for continuous harvest.
Companion Planting
Good Companions
Check more plant combinations with our Companion Planting Checker →
Wind pollinated — isolate 1/2 mile for purity. Easy to let bolt in heat.
Spinach in Other Locations
Your Pend Oreille County Garden Planner — Free
A 22-page printable planner built for Pend Oreille County (Zone 6a). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.