When to Plant Kai Lan in Castleton, VT
Kai lan (Chinese broccoli) is a brassica grown for its thick, glossy stems and small flower buds. It has a slightly bitter, broccoli-like flavor essential in Cantonese cooking.
Castleton, Vermont is in USDA Zone 5a. The average last spring frost is May 9 and the first fall frost is October 7, giving you a growing season of approximately 151 days.
At an elevation of 477 feet, Rutland County receives approximately 41.7 inches of rainfall annually with predominantly silt loam soil. Summer highs average 81°F, so choose short-season varieties of Kai Lan to ensure they mature before fall.
Castleton Soil Profile
Soil Type
Silt Loam
Soil pH
5.1-6.3
Drainage
Well Drained
Monthly Watering Guide for Kai Lan
Kai Lan needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.
| Month | Kai Lan Needs | Rainfall | You Supplement | Action |
|---|---|---|---|---|
| Jan | — | 3.1" | 0" | ❄️ Dormant |
| Feb | — | 2.4" | 0" | ❄️ Dormant |
| Mar | — | 3.6" | 0" | ❄️ Dormant |
| Apr | — | 3.7" | 0" | ❄️ Dormant |
| May | 4.3" | 3.9" | 0.4" | 💧 Light watering |
| Jun | 4.3" | 4.1" | 0.2" | 💧 Light watering |
| Jul | 4.3" | 4" | 0.3" | 💧 Light watering |
| Aug | 4.3" | 3.5" | 0.8" | 💧 Light watering |
| Sep | 4.3" | 3.8" | 0.5" | 💧 Light watering |
| Oct | 4.3" | 3" | 1.3" | 💧 Light watering |
| Nov | — | 3.4" | 0" | ❄️ Dormant |
| Dec | — | 3.3" | 0" | ❄️ Dormant |
Water needs are for active growing months only (May–Oct in Rutland County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.
Kai Lan Planting Timeline — Castleton, VT
Kai Lan Planting Calendar
| Activity | When | Date Range |
|---|---|---|
| Start Indoors | April 4 | Apr 4 – Apr 18 |
| Transplant Outdoors | May 9 | May 9 – May 23 |
| Direct Sow | April 25 | Apr 25 – May 16 |
| Harvest | June 27 | Jun 27 – Jul 25 |
| Fall Sowing | July 29 | Jul 29 – Aug 12 |
Plant 0.5" deep · 6" apart · Rows 12" apart
Month-by-Month Timeline
| Month | Activities |
|---|---|
| January | — |
| February | — |
| March | — |
| April | Start Indoors Direct Sow |
| May | Transplant Outdoors Direct Sow |
| June | Harvest |
| July | Fall Sowing Harvest |
| August | Fall Sowing |
| September | — |
| October | — |
| November | — |
| December | — |
Growing Conditions
☀️ Sun
Full Sun (6-8+ hours)
💧 Water
Moderate — regular watering
📅 Days to Maturity
45–60 days
🧪 Soil pH
Needs 6–7.5 · Your soil: N/A
🗺️ USDA Zone
Zone 5a
📆 Growing Season
151 days in Rutland County
Growing Tips for Castleton
Direct sow in spring or fall. Harvest when flower buds first appear but before they open. Cut stems at the base to encourage side shoots. Prefers cool weather.
Companion Planting
Good Companions
Avoid Planting Near
Check more plant combinations with our Companion Planting Checker →
Kai Lan in Other Locations
Your Rutland County Garden Planner — Free
A 22-page printable planner built for Rutland County (Zone 5a). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.