Blog

When to Plant Ground Cherry in Cornish, UT

Cornish, UT Zone 6a June

June in Cornish, UT — your action list

If you only do a handful of things in the garden this June, make it these. They're sequenced around your zone's frost timing.

Avg. last frost June 11
Avg. first frost September 2
Soil temp (4") 52°F
Watering Critical
Pest pressure High
Daylight 15 hrs
To set up a strong July, finish these tasks
  • Transplants going out: ground cherry

Instant PDF download. No spam, unsubscribe any time.

Ground cherries produce small, sweet, tropical-tasting berries enclosed in papery husks. They are related to tomatillos and cape gooseberries and self-sow readily.

Cornish, Utah is in USDA Zone 6a. The average last spring frost is June 11 and the first fall frost is September 2, giving you a growing season of approximately 83 days.

At an elevation of 6,265 feet, Cache County receives approximately 15.5 inches of rainfall annually with predominantly loam soil. Summer highs average 84°F, so choose short-season varieties of Ground Cherry to ensure they mature before fall. With low rainfall, drip irrigation is essential for growing Ground Cherry successfully. Mulch heavily to conserve soil moisture.

Cornish, UT (Zone 6a) Very short season
83 days
Last Spring Frost June 11
83 growing days
First Fall Frost September 2

Cornish Soil Profile

Soil Type

Loam

Soil pH

6.6-8.4

Drainage

Well Drained

Ground Cherry Planting Risk Windows

Early Start (70% safe) ✗ May not fit
Transplant: Jun 5 🍅 Harvest: Aug 14 – Oct 9
Recommended (50%) ✗ May not fit
Transplant: Jul 2 🍅 Harvest: Sep 10 – Nov 5
Safe Start (90%) ✗ May not fit
Transplant: Jul 15 🍅 Harvest: Sep 23 – Nov 18

Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.

Soil Compatibility in Cornish

How your county's soil matches Ground Cherry's growing requirements.

Soil pH

Your soil pH (6.6–8.4) overlaps with Ground Cherry's range (6.0–7.5), though not a perfect match.

Soil Texture

The loam soil in Cache County is excellent for Ground Cherry — good drainage, moisture retention, and nutrient holding capacity.

Organic Matter

Organic matter is moderate (2.3%). Annual compost additions will help Ground Cherry.

How to Plant Ground Cherry

1"
Planting Depth
15"
Between Plants
24"
Between Rows

Ground Cherry Water Budget

Plant needs
1.0″/week
Rainfall provides
0.8″/week
You supply
0.3″/week
Watering frequency Only during dry spells
Season total 191 gal / 100 sq ft
Drought risk

Water stress score is 10/10 — consider drought-tolerant varieties and mulching

Monthly Watering Guide for Ground Cherry

Ground Cherry needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.

Month Ground Cherry Needs Rainfall You Supplement Action
Jan 1.1" 0" ❄️ Dormant
Feb 0.9" 0" ❄️ Dormant
Mar 1.3" 0" ❄️ Dormant
Apr 1.7" 0" ❄️ Dormant
May 2" 0" ❄️ Dormant
Jun 4.3" 1.1" 3.2" 🚿 Regular watering
Jul 4.3" 1.3" 3" 🚿 Regular watering
Aug 4.3" 1.5" 2.8" 🚿 Regular watering
Sep 4.3" 1.3" 3" 🚿 Regular watering
Oct 1.4" 0" ❄️ Dormant
Nov 1.1" 0" ❄️ Dormant
Dec 0.8" 0" ❄️ Dormant

Water needs are for active growing months only (Jun–Sep in Cache County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.

Ground Cherry Heat Requirements (GDD)

What are Growing Degree Days (GDD)?

Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" — every day above 50°F deposits warmth that helps your plants grow.

Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.

Ground Cherry needs ~942 GDD — county provides 1,079 GDD Good fit

Ground Cherry Planting Timeline — Cornish, UT

Ground Cherry Planting Calendar

Activity When Date Range
Transplant Outdoors July 2 Jul 2 – Jul 16
Harvest September 10 Sep 10 – Nov 5

Plant 1" deep · 15" apart · Rows 24" apart

Month-by-Month Timeline

MonthActivities
January
February
March
April
May
June
July Transplant Outdoors
August
September Harvest
October Harvest
November Harvest
December

Growing Conditions

☀️ Sun

Full Sun (6-8+ hours)

💧 Water

1"/week · Only during dry spells

📅 Days to Maturity

65–80 days

🧪 Soil pH

Needs 6–7.5 · Your soil: acceptable

🗺️ USDA Zone

Zone 6a

📆 Growing Season

83 days in Cache County

Growing Tips for Ground Cherry in Cornish

Direct sow Ground Cherry outdoors after June 11 in Cache County when soil has warmed and frost danger has passed.

Your 83.0-day growing season in Cache County is tight for Ground Cherry (65.0-80.0 days to maturity). Start indoors and choose early-maturing varieties.

Common pests for Ground Cherry in this region include tomato hornworm and aphids. Use row covers early in the season and inspect plants weekly.

Cache County receives only 16" of rain annually. Ground Cherry needs consistent moisture — install drip irrigation or water deeply 2-3 times per week.

General growing tips

Start seeds indoors 6-8 weeks before last frost. Let fruits fall to the ground naturally when ripe inside their husks. The husk turns brown and papery when the fruit is ready.

Companion Planting

Good Companions

Avoid Planting Near

  • Fennel

Check more plant combinations with our Companion Planting Checker →

🌱

Your Cache County Garden Planner — Free

A 22-page printable planner built for Cache County (Zone 6a). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.

Instant PDF download. No spam, unsubscribe any time.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Cache County, UT. Local conditions may vary. Last updated: June 2026.